My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00143
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:54:06 AM
Creation date
10/5/2006 11:39:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153810
Contractor Name
Wood Lake Mutual Water & Irrigation Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />, d{J <br />STATE OF COLORADO \ <br /> <br />I <br /> <br />I <br /> <br />OFFICE OF THE STATE ENGINEER <br />Division of Water Resources <br />Department o( Natural Resources <br />1 J 1 J Sherman SIreN. Room 818 <br />Oenvcr, Colorado 8020) <br />Phone (03) 866.3581 <br />FAX (03) 866-3589 <br /> <br /> <br />I <br /> <br />Roy Romer <br />Covernor <br /> <br />I <br /> <br />Jdl'llCS S. Lochhead <br />Ell('("U\il/'t' Director <br /> <br />I <br /> <br />Mr. Reuben Hergert <br />Woods Lake Mutual Water & <br />Irrigation Company <br />12315 Weld County Road 72 <br />Eaton, CO 80615 <br /> <br />P.ECE!VED <br /> <br />HalO. Simpson <br />Slalc Engin<'Cf <br /> <br />February 1, 1996 <br /> <br />I <br /> <br />r r 6 G (, 1996 <br />. ..A l(1'\ RESOURcES <br />OtI{ISl:)(4 \ <br />-,,, QRADO <br />GREELEY, VV'- <br /> <br />I <br /> <br />When replying, please refer to: <br />ANGEL LAKE, DAMID: 030102 <br />WOOD LAKE DAM, DAMID: 030338 <br /> <br />I <br /> <br />RE: <br /> <br />HYDROLOGIC ANALYSES <br /> <br />I <br /> <br />Dear Mr. Hergert: <br /> <br />I <br /> <br />Our office has recently completed hydrologic analyses for tlle purpose of evaluating tlle <br />adequacy of the spillways for the subject dams. The spillway for Angel Lake Dam was found to be <br />adequate, primarily because the reservoir has sufficient surcharge capacity to store the inflow design <br />flood (IDF). However, the spillway for Wood Lake Dam was detennined to be inadequate and you <br />are hereby directed to proceed with designs to enlarge the spillway. It is,noted that while the IDF <br />for this dam is for an event equal to 50% of the probable maximum precipitation (PMP), <br />incremental damage analysis may show that a lesser event may be suitable as the !OF. By this letter <br />you are directed to complete any necessary construction by December 31, 1999 to bring the spillway <br />into compliance with our Rules. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />If you have any questions please contact Mr. Mike Cola or Mr. Greg Hammer of our Greeley <br />office at (970) 352,8712. <br /> <br />I <br /> <br />Sincerely, <br /> <br />I <br /> <br />if ~ .j7~ <br />~D':-' Simpson <br />State Engineer <br /> <br />I <br /> <br />xc: <br /> <br />Dick Stenzel, Division 1 Engineer <br />Mike Cola, Division 1 <br />Greg Hammer, Division 1 <br /> <br />I <br /> <br />HDS/kjv/woods.doc <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.