Laserfiche WebLink
<br />I <br /> <br />I <br /> <br />SPILLWA Y & SADDLE DAM <br />REPAIR OUTLET <br /> <br />TAllLl~ 3 <br />COST ESTIMATE <br />WOODS LAKE DAM <br /> <br />I <br /> <br /> UNIT <br />ITEM DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br />I. MOBILIZATION, INSURANCE, BONDS 1.00 L.S. $6,000,00 $6,000 <br />2. OUTLET <br /> a.) Liner 170,00 LY, $225.00 $38,250 <br /> n.) Control Gales 2,00 Each $9,000,00 $18,000 <br /> c.) Dewatering 1.00 CY, $2,500,00 $2,500 <br /> $58,750 <br />3, SPILLWAY <br /> a.) Excavation 2000.00 CY, $2.25 $4,500 <br /> h,) Concrete, 150' 30,00 CY. $350,00 $10,500 <br /> c.) Riprap 800,00 CY. S25,OO $20.000 <br /> d.) Seeding 1.00 Acre $1,800,00 $1,800 <br /> $36,800 <br />4, RAISE SADDLE DAM <br /> a.) Fill 1500,00 CY, S2,50 $3,750 <br /> b.) Borrow 1725.00 CY, $2,50 $4,312 <br /> c.) Crest Grave! 250,00 CY, $15.00 $3,750 <br /> d,) Riprap 125,00 CY. S25,OO $3,125 <br /> $ I 4,938 <br />5, TOE DRAIN 250,00 L.F, SI5,OO $3,750 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />TOTAL CONSTRUCTION COST <br />30% Engineering. Legal. Contingency <br />TOTAL PROJECT COST <br /> <br />$120.238 <br />$36.071 <br />$] 56.309 <br /> <br />I <br /> <br />I <br /> <br />SPILL WAY & SADDLE DAM <br /> <br />TABLE 4 <br />COST ESTIMATE <br />WOODS LAKE DAM <br /> <br />I <br /> <br /> UNIT <br />ITEM DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br />I. MOBILIZATION, INSURANCE. BONDS 1.00 L,S, $3,000.00 $3.000 <br />2, SPILLWAY <br /> a.) Excavation 2000,00 CY, $2.25 $4,500 <br /> b.) Concrete, 150' 30,00 CY, $350,00 $ I 0,500 <br /> c,) Riprap 800.00 CY, $25,00 $20,000 <br /> d.) Seeding 1.00 Acre $1.800,00 $1,800 <br /> $36,800 <br />3, RAISE SADDLE DAM <br /> a,) Fill 1500.00 c.y, $2,50 $3,750 <br /> b.) Borro\\' 1725.00 CY, $2,50 $4,312 <br /> c.) Crest Gravel 250.00 CY. $15.00 $3.750 <br /> d,) Riprap 125.00 CY, $25,00 $3.125 <br /> $14,938 <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />TOTAL CONSTRUCTION COST <br />30% Engineering. Legal, Contingency <br />TOTAL PROJECT COST <br /> <br />$54,738 <br />$16,421 <br />$71,159 <br /> <br />I <br /> <br />I <br />