My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00143
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00143
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 10:54:06 AM
Creation date
10/5/2006 11:39:01 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153810
Contractor Name
Wood Lake Mutual Water & Irrigation Company
Contract Type
Loan
Water District
1
County
Weld
Bill Number
SB 97-008
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br /> <br />D. RECOMMENDATIONS <br /> <br />We recommend the following work be considered to bring the dam up to current standards and to ensure <br />its safe operation in the future, The cost to conduct this work is $231,500, <br /> <br />I <br />I <br /> <br />1. <br /> <br />Construct a new spillway to pass the 50% PMP flood. <br /> <br />2. <br /> <br />Breach the dam and replace the outlet works, <br /> <br />3. <br /> <br />Raise the saddle dam to obtain proper freeboard. <br /> <br />I <br />I <br />I <br /> <br />4. Install a toe drain in the deep section of the dam. <br /> <br />Another option would be to phase the work and repair only what is needed with time, The dam is not <br />showing any obvious signs of structural distress at this time and the downstream section of the outlet <br />conduit is not deteriorated to the point of requiring repair. We believe the outlet is nearing its effective <br />life span however and plans should include replacement within the next five to ten years, <br /> <br />The minimum work required to satisfy the State Engineer's concerns at this time are as follows. The <br />estimated cost for this work is $71,000, <br /> <br />I <br /> <br />1. <br /> <br />Construct a new spillway to pass the 50% PMP flood. <br /> <br />2. <br /> <br />Raise the saddle dam to obtain proper freeboard, <br /> <br />I <br /> <br />E. STANDARD OF CARE <br /> <br />I <br />I <br /> <br />The recommendations contained in this Report represent our professional opinions. These opinions were <br />arrived at in accordance with currently accepted engineering procedures at this time and location. Other <br />than this, no warranty, either expressed or implied, is intended. <br /> <br />I <br />I <br /> <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />9 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.