FS0025X Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
FS0025X Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2014 4:25:13 PM
Creation date
10/5/2006 11:37:46 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0025X
Contractor Name
Upper Gunnison Uncompahgre Basin CWRPDA 1989
Contract Type
Loan
Water District
0
County
Archuleta
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
803
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
_i <br />Iof that project which adds 58,000 af of yield from a pumpback facility from <br />1 Blue Mesa Reservoir to Taylor Dark Reservoir was aiso evaluated. The unit <br />� cost of the base project (42,000 af) was determined to be•about b7150 per af <br />I of average yield based on the project capital cost of about 5300 million. The <br />corresponding figure for the lOU,U�O af project variation is 55310 per af. <br />� 8.3.5 Collegiate Range Project <br />� The average annual yield of this project identified in the 1985 report <br />titled Collegiate Range Project prepared by the David E. Fleming Company is <br />73,000 af. The project configuration and sizing presented in fhat report and <br />in preliminary project drawings supplied by the City of Aurora was reviewed by <br />� the Study Team. An independent cost estimate was then prepared based on that <br />configuration. The total capital cost of the project was estimated to be <br />about $512 million. <br />I <br />8.3.6 Union Park Project <br />IThis project would divert water from Taylor Park Reservoir into the <br />� proposed Union Park Reservoir located on Lottis Creek, south of Taylor Park <br />Reservoir. The project as proposed by NECQ is intended to supply water to the <br />I Denver Metro area during dry years only. This concept is different from the <br />other alternatives evaluated. In order to evaluate the yield under this dry <br />year delivery concept, an end user must be identified and an integrated system <br />Ioperation study performed. Such a study has not been reported on by NECO but <br />was done by the Corps of Engineers when they evaluated the Union Park Project <br />(Metropolitan Denver Water Supply System EIS, Volume VIII, 1988). The results <br />showed a"safe yield" ranging from 63,000 af to 111,000 af when operated as a <br />� component of the Denver Water Department (DWD) system. <br />The project configuration and sizing of individual features presented in <br />Ithe 1988 report titled Union Park Water Supply Project Reconnaissance <br />Evaluation Study prepared by Ebasco Services, Incorporated, was used by the <br />� <br />