Laserfiche WebLink
<br />Estimates of Construction Costs <br /> <br /> Item Quantity Unit Unit Cost Total Cost <br /> A. Intake <br /> 1. ReiDJ'orced concrete 85 C.Y. $ 70.00 ;:; 5,950.00 <br /> 2. Rip rap 85 sq. yd.. 4.50 382.50 <br /> 3. Excavation of site and ditch 330 C.Y. 1.50 1.95.00 <br /> Subtotal A ~ 6,827.50 <br /> B. Sedimentation Fond <br /> 1, Excavation of pond 1,480 C.Y. 1.50 2,220.00 <br /> 2. Corrugated metal rApe - <br /> 12" x 16 ga. 94 L.F. 25.50 2,397.00 <br /> 3. Irrigation gate ,- 6" X 13' 1 ea. 450.00 450.00 <br /> 4. Clearing 2.2 acre 1,500.00 3,300.00 <br /> 5. Ca tl-m1k 35 L.F. 15.00 525.00 <br /> 6. Trash rack 1 ea. 250.00 250.00 <br /> 7. Reinforced concrete 8 C.Y. 55.00 440.00 <br /> 8. Meters, orifice _ 6" 2 ea. 1,000.00 _2,000.00 <br /> Subtotal B $ 1l,582.00 <br /> C. Hater Treat.'Tlent Plant <br /> 1. Treatment plant, 300 g.p.m. <br /> Electromedia III or equal, compJete <br /> ...>1 th controls and plumbing 1 ea. 18,500.00 18,500.00 <br /> 2. Gas chlorinator ' 1 ea. 2,650.00 2,650.00 <br /> 3. 22' x 35' building, insulated <br /> and heated 1 ea. 15,400.00 15,400.00 <br /> 4. Pipes, Ii ttings within building 20 L.F. ,9.25 785.00 <br /> 5. Altitude valve with switches <br /> and solenoid 1 ea. 2,870.00 2,870.00 <br /> 6. So;rge tank (200 gal.) with 3/4 <br /> H.P. air compressor 1 ea. 1,250.00 1,250.00 <br /> 7. PO~ier service to treatment plant 290 l..1.F. 1.25 362.50 <br />...J 8. lilater quality test kit 1 ea. 1,175.00 1,175.00 <br /> Subtotal C $ 42,992.50 <br /> D. Tank Site <br /> 1. 100,000 Storage tank 1 ea. 27,000.00 27,000.00 <br /> 2. 6" gate valves 4 ea. 156.00 62h.oo <br /> 3. ~.erflow drain ditch 960 L.F. 1.25 1,200.00 <br /> 4. Corrugated metal pipe - <br /> 1811 x 16 ga. 28 L.F. 30.00 840.00 <br /> 5. Sand blast arn repaint existing <br />J tank interior 1,890 sq.ft. 3.12 5,896.80 <br /> Subtotal D $ 35,560.80 <br /> <br />- 38 - <br />