Laserfiche WebLink
<br />. <br /> <br />Estimates of Construction Costs <br />(continued) <br /> <br /> Item Quantity Unit Unit Cost Total Cost <br />E. Pipelines <br /> 1. 6" - AS~ 60-18/40 cast iron <br /> or Class 52 ductile iron pipe 16,050 L.F. $ 9.55 $ ],53,277.50 <br /> 2. Chte Valves,' 6" ],5 ea. 180.00 2,700.00 <br /> 3. fire Hydrants, 6n JJ ea. 695.00 9,035.00 <br /> 4. 12" :x: 16 ga. corrugated metal, <br /> encasement pipe 200 L.F. 35.00 7,000.00 <br /> Subtotal E $172,012.50 <br /> Subtotal A - E $268,975.30 <br />F. ' Contingencies (20%) 53,795.06 <br />G. 2-years' inflation (lD%) 26,897 .53 <br /> Subtotal A - G $349,667.89 <br />B. Engineering and Administration 32~'000.OO <br />- <br /> Total ",$~2,367 .89 <br /> " <br /> Total P.roject Cost $382,367.89 <br /> 80% grant applied for <br /> through HOD $305,894.31 <br /> BalanCe - amount requested <br /> fran Colorado Water <br /> Conservation Board 76,473.58 <br /> <br />- 39.- <br />