My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153166 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153166 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153166
Contractor Name
Rico, Town of
Contract Type
Loan
Water District
0
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Estimated Costs <br /> <br />The cost estimates herein are derived as follows. <br />We called a localsupp1ier to obtain tne most clU-rent p!"J.ces of <br />all materials. \-!e then estimated the labor req\lirements <"nd added <br />equipnent costs. The sum of these was checked with c\lrrmt contract <br />prices under similar conditions. Prices in Rico are boond to be higher <br />due to the isoJ;J,ted location, the precipitou,s t':1:rrBin and the short <br />construct:i.on season. Fe have added to our esti:"lated prices to cover <br />-t,he extra e:;:penses caused by the location a.\1d climate oJ: this jobsite~ <br />Another factor, the prox:i.mity of rock in certain areas of constrL\ct,ion, <br />wi.ll add cost to trenching <w.d backfilling of pipeJines. <br /> <br />- 37- <br />
The URL can be used to link to this page
Your browser does not support the video tag.