My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153166 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153166 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153166
Contractor Name
Rico, Town of
Contract Type
Loan
Water District
0
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Design <br /> <br />Sizing Criteria <br /> <br />The following guidelines axe suggested in sizing and in the location <br /> <br />of the facilities proposed in this project: <br />1. The diversion structure should be made oJ: reinforced concrete <br /> <br />designed to accommodate a 400 c.f.s. nood without overflow. <br />(See page 17 .) All concrete incorporated in this project <br />should achieve rnirdmum 3,000 p.s.i, 28 day compressivest.rength. <br />2. The diversion ditch ShOl11d be designed to accommodate 3.0 <br /> <br />'ccf .s.and no more. A suggestion may be to size the dcwn- <br /> <br />- '-"'-' .--"".,......,-,.. . . --__.._ _ ~.- ",- :.~_.-'-- .".- -- --=---="'"T.""-OC-; <=.-__,~:--, ;--~... ...,.,..._. ~ .. ----. f''''~' -'-' :-'-~',.-u _'_~,-_ u_~ _. _ _. . <br /> <br />hill bank of the canal to overflow into the stream at flo~JS <br /> <br />over 3.0 cS.s. The diversion canal inJ.et should be designed <br /> <br />so it may be closed if necessary. <br /> <br />3. The clarifier and sedimentation pond should be sized to store <br /> <br />at least three days I supply of residential and cornrnerciaJ. water. <br /> <br />The pond should be located above the 100 year flood line, A <br /> <br />minimum of three feet freeboard Should be allowed to the top <br /> <br />of the pond embankment froln high water :line. The overflovJ <br /> <br />Should be designed to accOlmnodate3.0 c .Ls . without difficulty. <br /> <br />The pond should be designed to allOli complete drainage for <br /> <br />periodic cleaning of Sludge from the bottom. The outlet works <br /> <br />should be designed to draw water a minimum distance of one foot <br /> <br />from the bottom to allow room for sludge bllildup. Outlet should <br /> <br />dra~J loJater from a min:i:nu:n of .five feet below the surface to <br /> <br />avoid floating debris and freeze hazards. The outlet should be <br /> <br />screened with a device which can be easily removed and cleaned. <br />
The URL can be used to link to this page
Your browser does not support the video tag.