My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153166 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153166 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:08 AM
Creation date
10/5/2006 11:37:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153166
Contractor Name
Rico, Town of
Contract Type
Loan
Water District
0
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
125
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />4. The pipeline frOill the intake 'larks to the treatl11ent plant <br />should be designed to accafu"odate peak daily flow or ten hour <br />fillup on the tanks, l1hichever is greater. lue type of pipe <br />should be either Class 52 ductile iron or ASTM 60-l8/40,cR6t <br /> <br />iron. <br /> <br />metal meeting A .vl.1-1.A. require.m.ents and should be coat ed with <br /> <br />a hard, durable surface inside. <br />7. The pipeline into the town fran the tanks should be sized at <br />peak hourJ"y now or 737 gal.lmin., ,.hich meets N.F.B.U. codes. <br />Pipelines should be either Class 52 ductile iron or ASTt1 60 - <br />JB/Lo cast iron. <br />8. Distribution lines should be sized to accommodate fire pro- <br />tection needs. The grading schedule for municipal fire pro- <br />tection states that the minimum fire now at each fire hydrant <br />shall be 500 gal.lmin. It also states that if a minimum niJ',; <br />of 250 gal./min. were not available at the fire hydrants, the <br /> <br />-33 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.