My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00133
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 3:47:18 PM
Creation date
10/5/2006 11:37:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153633
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />05-07-1993 10:14AM <br /> <br />FROM <br /> <br />I <br />\. <br /> <br />) <br /> <br />TO <br /> <br />",,' <br />C:, ') <br /> <br />8868664474 <br /> <br />P.03 <br /> <br />Conservation Board, and the United States Forest Service. <br /> <br />,~, <br /> <br />TEC shall be available during the review process to answer questions, attend meetings, or provide any. <br />additional information reqUired by the Colorado State Engineer's Office, the Colorado .water <br />ConselVation Board, or the United States Forest Service to complete their review and approval process. <br /> <br />TEC shall make revisions, at no additional cost to the City, to the plans and technical specifications <br />necessary to obtain the approval of the design dQClj!D.ents by the Colorado State Engineer's Office, the <br />Colorado Water Conservation ~ard, and the Unite:d States Forest SelVice. No revisions, agreements, <br />or concessions, as required by the Colorado St:ite ISngineer.s Office, the Colorado Water ConselVation <br />Board, or the United States Forest Service shall be made without prior approval by the City. The City <br />shall be notified and have the option to participate iJ1 any meetings between TEe and the Colorado State <br />Engineer's Office, the Colorado Water ConseIVaJion Board, and the United States Forest SelVice. <br />Further, TEe shall keep the City fully informed of any and ail communications between TEC, the <br />Colorado State Engineer's Office, and the United States Forest Service. <br /> <br />:,_... <br /> <br />FOlIowing the approval of the design documents by the Colorado State Engineer's Office, the Colorado' <br />Water Conservation Board, and the United States Forest Service, TEe shaH provide to the City: I) five <br />, complete sets of all design documents and complete bid doCllll1eIltS as per City specifications and 2) one <br />set of high-quaIity, unbound, reproducible design and bid documents. <br /> <br />Task 8 . Project Management. TEC, acting through the project manager, shall maintain close contact <br />with the City throughout the execution of this contract. A comprehensive monthly progress report shaIl <br />be prepared by TEC and forwarded to the City. Memoranda shall be generated following all meetings <br />between the City and TEC, or between the City and other involved agencies, to insure a clear <br />understanding between meetiiJg participants. Memotanda shall be distributed to the meeting participants <br />and the City. <br /> <br />This wk shall also include the preparation of the invoices and billing information in accordan;ce with <br />Article 3, Paragraph A of this project. <br /> <br />"'---' <br />
The URL can be used to link to this page
Your browser does not support the video tag.