My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00133
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00133
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/1/2011 3:47:18 PM
Creation date
10/5/2006 11:37:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153633
Contractor Name
Greeley, City of
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 91-1006
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
54
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />05-07-1993 10'13AM FRO~ <br />FJ <br /> <br />I <br />',~, <br /> <br />TO <br /> <br />8868664474 P,02 <br /> <br />f''] <br /> <br />1. <br />2. <br />3. <br />4. <br /> <br />Riprap and bedding design. <br />Toe drain design. <br />Design of filter blankets. <br />Design of control section and erosion control protection for the emergency <br />spillway. <br />Seepage considerations and analysis of alternative control measures. <br />Deteimine embankment details and slope protection. <br />Modification to the outlet works and outlet channel. <br />Calctilation of PMF using HEC-I. ' <br /> <br />5. <br />6. <br />7. <br />8. <br /> <br />Task 5 . FInal Design - Final design will begin only after selection and approval by the City of a single <br />Improvement alternative. At this time, Final Design will begin. Additional review meetings will be held <br />with the City Staff at 50 peccent and 90 percent completion. These meetings will review drawings and <br />design concepts and will allow the opportUnity for adjustments to meet City needs and resolve technical <br />questions. <br /> <br />In addition to in-house Staff and City review, TEe will provide quality control to check completed <br />Contract Documents prior to construction. These checks ensure that the Project Team's total expertise <br />andeXperieli.ce has been utilized on the project and will reduce the possibility of omissions and errors that <br />could preSent problems during construction. Our in-house review takes place concurrently with the City's <br />fma1t~ie\v/~prior to printing the Contract Documents for advertisement. After all reviews are <br />;- ".>::\:i;;;_1'.;~i!f~~'-:~.,',:: '. -" . "'. _ _ -. '. '-. <br />, cOmplete;'~theDoc:uinents will be modified and prepared for bidding. <br /> <br />!,.., <br />i <br /> <br />.... '. <- .. <br /> <br />Task ~ - F1naI Design Report. TEC shall prepare a final design report that describes in detail the <br />methodology used in formulating the final design for Hourglass Dam and appurtenant structures. The <br />designrepon shall contain all background information, calculations, and other required documentation <br />necessary to allow a thorough review of project plans and specifications by the City, the Colorado State <br />Engineer's Office, the Colorado Water Conservation Board, and the United States Forest Service. <br /> <br />Task; - Agency Submittal and Review. Following a review of the final design documents by the City <br />and the Colorado Water Conservation Board and at the direction of the City, TEC shall submit the <br />construction plans, technical specifications, and other required documentation to the Colorado State <br />Engineer's Office for review and approval. The submittal shall be done in strict accordance with the <br />rules and regulations of the Colorado State Engineer's Office. Three packets containing the same <br />documents and information submitted to the Colorado State Engineer's Office shall be forwarded to the <br />City. ,One of the final design documents shall be forwarded by the City to the CoJoradq Water <br /> <br />'--' <br />
The URL can be used to link to this page
Your browser does not support the video tag.