Laserfiche WebLink
<br />,\ <br /> <br />i <br />I <br />I <br />!'--" <br /> <br />i <br />''-' <br /> <br />v <br /> <br />05-07-199310:12RM <br /> <br />FROM <br /> <br />TO <br /> <br />8868664474 P.01 <br /> <br />c"")) <br />,,' <br /> <br /> <br />'-)' <br />( . J <br /> <br />4:";.<. : !,'V;'if <br />.; \\"b,..~~....J.-:::"..,:..f. <br />',Yo' ~ (\ , <br />(X~/ ~'\t <br />-;; \\l.~''\';ig~ <br />, I\(;V <br />"" ,0.10& <br />Of"- <br /> <br />APPENDIX A <br />HOuRGLASS REHAlULITATION DESIGN <br />SCOPE OF SERVICES <br /> <br />Task 1. InItial Coordinatiol) Meeting. The Clty'6 representative and our project manager will schedule <br />the initial coordination meetiDg. The agenda for tills meeting should Include distribution of all criteria, <br />reports, and existing data held by the City. The project team will submit a preliminary schedule of <br />events.' The meeting will cover preliminary design criteria, scheduling. contract p~rt <br />and drawing formals to determine the extent of Contract preparation. <br /> <br />Task 2 - Data Gathering. After review of the d~ supplied at the initial coordination meeting, we will <br />begin field Inspection, surveying, soils InvestigatiollS, and literature review. Assumptions we have made <br />regarding work under this task are: <br /> <br />· Published data for reservoir fact1ities, mapping, and survey Information will be <br />used as much as possible. Where existing data Is questionable, as Identified by <br />the City orby our review, additional field data will be obtained. <br /> <br />. <br /> <br />Elevations and locations of existing facilities, easements,and right~f-ways will <br />be tied to the City monument system.' ' <br /> <br />· New. aerial photography will be developed to be used for topographic map <br />preparation of the proj~ area. Mapping will Include contours and all <br />planemetric features. Individual trees will not be Included on the map. <br /> <br />Task 3 . Hydrologic and Hydraulic Analysis - The hydrologic analysis In the Feasibility Report will <br />need to be modified to conform with analysis similat' to the method used that is current! y accepted by the <br />SEO. <br /> <br />Task 4 - Preliminary Design - Preliminary designs and evaluations will be made for only those <br />alternatives identified by the Project Team and City during the workshop meetings. A brief preliminary <br />design 'report will be prepared and will consist of a narrative describing the design criteria,alternative <br />selection process, methodologies used, hydrologiC and hydraulic analyses, Opinions of Cost, and <br />discussion about advantages and disadvantages of each alternative. Items that will be Included in the <br />.--... <br />Preliminary design include the following: <br /> <br /> <br />, of pages .. 5 <br /> <br />__~8XII....../1" AA........... <br /> <br />Phone' <br />"350 -'" , <br />Fullf_ _ _ _ _,j_ <br />