Laserfiche WebLink
<br />" <br /> <br />. <br /> <br />. <br /> <br />-" <br /> <br />. <br />... <br /> <br />The extent of project drainage to be provided should be developed in <br /> <br />conjunction with appropriate personnel <br /> <br />of the Colorado Water <br /> <br />Conserv8tion Board. For projectS where major drainage problems exist, <br /> <br />or are anticipated to occur vnder project operation and extensive <br /> <br />drainage faci 1 itles will be rei1ul red, the Board should be consulted <br /> <br />before preparing the project drainage plan. <br /> <br />F. SEDIMENTATION <br /> <br />Describe the effect suspended sol ids and bedload may have on <br /> <br />project facll it ies and what provisions are being made to minimize the <br /> <br />effects. If a reservoir is involved, estimate sediment storage required <br /> <br />and detenmine elevation of reservoir outlet accordingly. Describe basic <br /> <br />data and methods used 'in computation of sedimentation estimates. <br /> <br />G. RIGHT-OF-WAY <br /> <br />The report should contain a discussion of the right-of-way <br /> <br />requlren~nts; right-of-way avail~ble; and if additional right-of-way Is <br /> <br />required, proposals for such acq~lsition. <br />