My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00126
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00126
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 9:18:00 AM
Creation date
10/5/2006 11:36:57 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153383
Contractor Name
Grand Mesa Water Conservancy District
Contract Type
Grant
Water District
0
County
Delta
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
38
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />" <br /> <br />. <br /> <br />. <br /> <br />.< <br /> <br />ESTIMATED COST - CHAPTER V <br /> <br /> Hourly Hours Estimated <br />Personnel Rate (Estimated) Cost <br />Principal Engineer $ 45.00 32 $ 1,440.00 <br />Project Engineer $ 35.00 30 1,050.00 <br />Design Engineer $ 30.00 100 3,000.00 <br />Geologist <br />(Consultant) $ 45.00 10 450.00 <br />Geologist <br />(Staff) $ 30.00 40 1,200.00 <br />Technician $ 18.00 80 1,440.00 <br />Draftsman $ 18.00 80 1,440.00 <br />Drilling, soil and <br />foundation, analysis 5,000.00 <br /> <br />SUB10TAL - CHAPTER V <br /> <br />$ 15,020.00 <br /> <br />Remarks: Investigations and surveys of routes for feeder channel <br />to Cactus Park. Siting and sizing of the proposed power <br />plant; surveys, geology site preparation and preliminary <br />design layout of Cactus Park Reservoir; conditions of <br />existing laterals and ditches associated with use of <br />water to be released from Cactus Park raservoir looking <br />to their rehabilitation and reconstruction to improve <br />water delivery and save water. <br /> <br />Geologic mapping of Cactus Park Dam and Reservoir site <br />to be included. Geologic data from six holes drilled <br />by the Bureau of Reclamation will be utilized. Addi- <br />tional drilling will be required in order to determine <br />the engineering and structural feasibility of the pro- <br />posed plan. <br /> <br />Preliminary investigation of possibility of generating <br />hydropower downstream from Cactus Park Reservoir. <br /> <br />Investigation of diverting water from Tongue Creek in <br />winter months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.