Laserfiche WebLink
<br />'. <br /> <br />. <br /> <br />. <br /> <br />.' <br /> <br />... <br /> <br />An outl ine of the general evaluation procedure and <br /> <br />technical data require~nts are described in the supplement. <br /> <br /> <br />7.) Sizing criteria for canal cross-drainage culverts or <br /> <br /> <br />structures. (These criteria must be approved by the Board <br /> <br /> <br />prior to use in design~.) <br /> <br /> <br />8.) Maximun, minirnm, and nonnal water surface elevations for <br /> <br /> <br />design of power plants. <br />9;) The nurrber and sizes of units in power plants should be <br />selected to provide arfIPle flexlbil ity to meet varying water <br />demands. <br />10.) Analysis of water halTTTli!r in pipel ines, and proposed method of <br />protecting pipelines against water-hammer pressures. <br />11.) State availabil ity and source of required construction <br />materials. <br />'12.) Describe method of river diversion during construction. <br />D. STRUCTURE PLANS <br /> <br />Describe proposed major structures and typical minor structures. <br /> <br /> <br />1.) Include as appendix material to the feasibility report profile <br /> <br /> <br />and typical sections of canals and pipel ines, giving <br /> <br /> <br />dimensions, hydraul ic properties, water surface or hydraulic <br /> <br /> <br />gradeline elevations, and class of pipe for pipelines. <br /> <br /> <br />2.) Include layout and sections of each major structure and <br /> <br /> <br />typical minor structures, shewing important dimensions and <br />hydraulic properties. <br />E. DRAINAGE <br /> <br />Descr I be present or ant i c i pated dra i nage prob 1 ems and plans for <br /> <br />their correction, Including the data l,isted above in items B, C, and D. <br />