Laserfiche WebLink
<br />I <br />I <br />I II <br />,I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Task 11 - Provide EIS Support Data <br />Engineering related data and evaluations were provided for use in <br />preparation of the EIS. <br /> <br />Task 12 - Reporting and Coordination <br /> <br />Task 13 - Prepare Final Report <br />This task included all activities necessary for preparation of this <br />feasibility report. <br /> <br />1.2 BACKGROUND <br /> <br />A. Rock Creek Project <br /> <br />A site on Rock Creek was identified as a potential water storage facil- <br />ity for Western Slope Users in initial studies performed jointly by the <br />Northern Colorado Water Conservancy District (NCWCD) and the Colorado <br />River Water Conservation District (River District) in 1982-83. Later <br />studies performed for the River District determined that a roller com- <br />pacted concrete dam at the site would be technically feasible. Pre- <br />liminary cost estimates were developed during these studies. However, <br />they were based on incomplete knowledge of site conditions and materi- <br />als sources and their accuracy was therefore limited. <br /> <br />Additional studies performed during these feasibility investigations <br />and definition of the project at the Rock Creek site are described in <br />Chapter 3. <br /> <br />8. Muddy Creek Project <br /> <br />Four sites on Muddy Creek referred to as Wolford Mountain Reservoir <br />Sites A, B. C, and D were identified in studies performed for the River <br />District and NCWCD in 1983. These studies concluded that Site C was <br /> <br />1 - 3 <br /> <br />7062W/5020W <br />