Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br /> <br />the most favorable of the four because of its lowest capital cost per <br />acre foot and becaused the storage volume is closest to the probable <br />basin yield. The River District therefore decided that a feasibilility <br />design should be developed for Site C for comparison with the Rock <br />Creek Project alternative. <br /> <br />Additional studies performed during these feasibility investigations <br />and definition of the project at Site C are described in Chapter 4. <br /> <br />C. References <br /> <br />The following reports provided background information for these current <br />studies of the Rock Creek or Muddy Creek projects: <br /> <br />1. Bechtel Civil & Minerals Inc., "Rock Creek Dam Conceptual Layout & <br />Cost Estimate," July, 1984. (Prepared for the River District) <br /> <br />2. Harza Engineering Company, "Review of Wolford Mountain Reservoir <br />Project," June 1983. (Prepared for Denver 80ard of Water Commis- <br />sioners) <br /> <br />3. Swaisgood & Associates, "Comparative Study of Alternative Reser- <br />voir Sites Near Krenunling, Colorado," December 1983. (Prepared <br />for Municipal Subdistrict, Northern Colorado Water Conservancy <br />District) <br /> <br />4. Western Engineers, Inc., "Rock Creek Water Supply," March 1984. <br />(Prepared for the River District) <br /> <br />5. Western Engineers, Inc., "Wolford Mountain Reservoir Project <br />Feasibility Study," March 1983. (Prepared for the River District) <br /> <br />6. Western Engineers, Inc. and R. J. Irish, "Engineering and Geologic <br />Study and Construction Materials Investigation - Rock Creek Dam <br />Site and Reservoir Area," August 1984. (Prepared for the River <br />District) <br /> <br />1 - 4 <br /> <br />7062W/5020W <br />