My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153629 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153629 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2011 10:25:18 AM
Creation date
10/5/2006 11:36:35 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153629
Contractor Name
Colorado River Water Conservation District, The
Contract Type
Loan
Water District
50
County
Grand
Bill Number
SB 87-15
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
292
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I II <br />II <br />II <br />I <br />I <br />! I <br />II <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />II <br /> <br />Task 4 - Site Geologic and Construction Materials Evaluation - Rock <br />Creek <br />The objective of this task was to determine the structural geologic <br />features and lithology of the area and determine the availability and <br />suitability of local construction materials. The work consisted of <br />geologic mapping, seismic refraction, subsurface drilling, obtaining <br />materials samples and trial RCC mix designs. <br /> <br />Task 5 - Access Roads and Relocation <br />Alignment of access roads required for each alternative project were <br />developed. Basic plans were formulated for relocation or modification <br />of roads, power1ines and other facilities existing within the proposed <br />reservoir areas. <br /> <br />Task 6 - Formulate Rock Creek Plan and Prepare Cost Estimates <br />A definite project plan was developed from the results of previous <br />tasks. The dam axis, type and height were selected, a preliminary <br />project design was developed, drawings were prepared and a feasibility <br />level cost estimate was made. <br /> <br />Task 7 - Site Characteristics - Muddy Creek Site C <br />This task was similar to Task 3 except Muddy Creek Site C alternative <br />was studied. <br /> <br />Task 8 - Site Geologic and Construction Materials Evaluation - Muddy <br />Creek Site C <br />This task was similar to Task 4 except Muddy Creek Site C was evaluated. <br /> <br />Task 9 - Plan Formulation and Cost Estimate - Muddy Creek Site C <br />This task was similar to Task 7 except plans and estimates were devel- <br />oped for Muddy Creek Site C. <br /> <br />Task 10 - General Evaluation - Muddy Creek Site A <br />This task was subsequently deleted and is not covered by this report. <br /> <br />1 - 2 7062W/5020W <br />
The URL can be used to link to this page
Your browser does not support the video tag.