My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00118
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:13:19 AM
Creation date
10/5/2006 11:36:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153670B
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
Bill Number
SB 88-30
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />.. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Ie <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />{' <br /> <br />I <br /> <br />, . <br /> <br />An estimate of time required to construct the entire project will be made, <br /> <br /> <br />considering weather, permit restrictions, and other construction. The estimate <br /> <br /> <br />will be based on similar projects completed in the area. Minimum and maximum <br /> <br /> <br />times will be estimated. Alternatives to constructing the entire project will <br /> <br /> <br />also be considered. Phasing of the project to coincide with the State Highway <br /> <br /> <br />Department's construction schedule will be examined. Elements of the proj ect <br /> <br />will be analyzed to determine the benefit of early or phased construction. <br /> <br /> <br />Consideration will be given to methods of maintaining delivery of water during <br /> <br /> <br />construction. The end product will be a number of diagrams detailing the <br /> <br /> <br />scheduling of construction for the alternatives considered. <br /> <br />C. Cost Estimate: <br /> <br /> <br />The objective is to provide a cost estimate for the selected alternative to <br /> <br /> <br />the raw water pipeline for the District's planning purposes. <br /> <br />A construction cost estimate will be made for the preferred alternative. <br /> <br /> <br />The estimate will be based on results from bids on similar proj ects. An <br /> <br /> <br />allowance of at least 20 percent will be made for contingencies. An estimate of <br /> <br /> <br />the right-of-way acquisition needs and cost will be made based on the selected <br /> <br /> <br />pipeline route or pump station location. The annual cost to operate and <br /> <br /> <br />maintain the facility will be estimated. These costs will include operator <br /> <br /> <br />wages, equipment repair, power, and other routine costs. The end product will <br /> <br />be a descriptive report and tabulation of costs for the preferred alternative. <br /> <br />D. Financial Evaluation <br />The objective is to provide a financial program to fund the construction of <br />the selected alternative. <br /> <br />A financial program will be developed to determine annual expenditures <br /> <br />including loans, interest cost during construction, and fees to obtain bonds. <br /> <br /> <br />The alternative construction schedules will be considered for their impact on <br /> <br /> <br />cost due to inflation. The financial program will be reviewed with the District <br /> <br /> <br />and CWCB. The end product will be a payback schedule for loans and a proposed <br /> <br /> <br />method of financing the entire construction project. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.