My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00118
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00118
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:13:19 AM
Creation date
10/5/2006 11:36:33 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153670B
Contractor Name
Ute Water Conservancy District
Contract Type
Loan
Water District
72
Bill Number
SB 88-30
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
29
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I. <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Ie <br /> <br />I <br /> <br />I <br /> <br />I <br />I <br /> <br />I <br /> <br />I <br /> <br />I <br />{' <br /> <br />I <br /> <br />Permitting <br />The objective is to assess the requirements for permits to complete the <br />proj ect. <br /> <br />Public agencies with permitting authority will be contacted to obtain their <br /> <br /> <br />concerns and probable permit requirements. It is anticipated that the following <br /> <br /> <br />agencies will be involved: U.S. Army Corps of Engineers, Bureau of Land <br /> <br /> <br />Management, State Health Department, State Highway Department, State Division of <br /> <br /> <br />Wildlife, and Mesa County Engineering Department. The end product will be a <br /> <br /> <br />report describing probable permits and permit conditions. <br /> <br />Conclusions and Recommendations <br /> <br /> <br />The objective is to provide a summary of the results of the evaluation and <br /> <br /> <br />recommend a course of action for the District to follow. <br /> <br />Summary charts will be prepared of the alternatives considered and the <br /> <br /> <br />reasons to select two for detailed consideration. A summary of the construction <br /> <br /> <br />schedules and cost will be presented. The end product will be a recommendation <br /> <br /> <br />to the District to follow a selected alternative. <br /> <br />The study will progress according to the schedule in Appendix C. As each <br /> <br />chapter is completed, it will be submitted to the District and CWCB for review. <br /> <br /> <br />Comments will be included before submittal of the final draft. The project <br /> <br /> <br />schedule assumes that reviews will be completed in ten days or less. Prior to <br /> <br /> <br />selection of the preferred alternative for more detail study, the District and <br /> <br />CWCB will be appraised of the results of the investigation and participate in <br /> <br /> <br />final selection. Ten copies of the final report will be provided to the <br /> <br /> <br />District. <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.