My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C152718 Feasibilty Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C152718 Feasibilty Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:07 AM
Creation date
10/5/2006 11:36:25 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153718
Contractor Name
Morgan County Quality Water District
Contract Type
Loan
Water District
0
County
Morgan
Bill Number
HB 95-1155
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />SECTION 11 <br />FINANCIAL PROJECTIONS <br /> <br />GENERAL <br />All revenues and expenses are swnmarized Ut Table Number 10 to illustrate the financial ability <br />of the District to undertake the needed present and future improvements. <br /> <br />Following is a brief description of each of the:: colunms in Table Number Ten: <br /> <br />Column 1 <br />Column 2 <br /> <br />Column 3 <br />Column 4 <br /> <br />Column 5 <br /> <br />Column 6 <br />Column 7 <br /> <br />Column 8 <br /> <br />Column 9 <br />Column 10 <br /> <br />Column 11 <br /> <br />Column 12 <br />Column 13 <br />Column 14 <br /> <br />Column 15 <br /> <br />Column 16 <br />Column 17 <br /> <br />Column 18 <br /> <br />Column 19 <br />Column 20 <br /> <br />Self explanatOlY. <br />The number of taps expected to be connected to the system at the end of the <br />year. <br />The amount of water expected to be used during the calendar year in acre feet. <br />The revenue expected to be ge::nerated from water sales during the calendar <br />year. <br />The revenue expected to be generated from the sale of taps during the calendar <br />year. <br />The amount of tax revenue ex:pected to be collected during the:: calendar year. <br />Total revenue expected to be collected from water sales, tap fees and taxes <br />during the calendar year. <br />Expenses expected to be incurred for operating and maintaining the system <br />during the calendar year, not including the cost of pumping. <br />Expenses expected to be incurred for all pumping during the calendar year. <br />Estimated amount to be paid to the Northern Colorado Water Conservancy <br />District for maintaining the pipeline from Carter Lake <br />A reserve for lateral line improvements and appurtenances needed to <br />accommodate growth <br />Total ofcolunms 8,9,10,&11. <br />Net operating income less opefating expenses for the:: calendar year. <br />Principal and interest for the e;risting loan from the Colorado Water Resources <br />and Development Authority for the calendar year. <br />Principal and interest for the e;risting loan from the Colorado Water <br />Conservation Board for the calendar year. <br />Anticipated future construction costs to be funded from reserve::s. <br />Principal and interest for the loan of $1,090,000 being requested from the <br />Colorado Water Conservation Board. <br />Principal and interest for the loan of $1,090,000 being requested from the <br />Colorado Water Resources and Power Development Authority. <br />Sutplus funds expected to be generated during the calendar year. <br />Accumulated sutplus funds. <br /> <br />19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.