<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />.1 <br />I <br />I <br />I <br /> <br />SECTION TEN <br />OTHER SYSTEM IMPROVEMENTS <br /> <br />GENERAL <br />Several other improvements will need to made to the system as growth occurs. These have <br />been identified, cost estimates prepared, and the dates established at which time the various <br />elements need to be constructed. Following is a table that shows a description of the element, <br />the present estimated project cost and the cost escalated at 3.5% per annum to the time <br />construction will be required. <br /> <br />DATE <br /> <br />1998 <br /> <br />1999 <br />2004 <br /> <br />2009 <br /> <br />2010 <br />2015 <br /> <br />TABLE 9 <br />FUfURE IMPROVEMENT COSTS <br /> <br />DESCRIPTION <br /> <br />ESTIMATED <br />COST <br /> <br />ESCALATED <br />COST <br /> <br />L Add 12" line from Roads 10 and <br />Q to storage tank on Road W <br />2. Enlarge the Wiggins pump station <br />and construct line improvements <br />south of Hoyt <br />3. Control and monitoring system <br />Add 8" loop south of Fort Morgan <br />Add San Arroyo well and purchase <br />augmentation water <br />Add connections from Roads 15 & <br />16 to Road 17 <br />Add Road W tank pumping system <br />Add line from Smart wells to Roads <br />20&Q <br /> <br />$1,159,000 <br /> <br />$490,000 <br /> <br />$163,000 <br />$73,000 <br />$507,000 <br /> <br />$550,000 <br /> <br />$700,000 <br /> <br />$766,000 <br />$1,119,000 <br /> <br />$490,000 <br />$740,000 <br /> <br />$661,000 <br /> <br />$1,270,000 <br /> <br />18 <br />