My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00110
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 9:23:47 AM
Creation date
10/5/2006 11:36:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153491
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Loan
Water District
0
County
Routt
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, { ( <br />R <br />limited to, applicable portions of salaries, travel, per diem, leave of <br />employees and legal expenaes, overhead and general expenae allocable to <br />inspection and approval of work performed by the District, the examination <br />and approval of title to landa or interests in landa, and the inspection and <br />auditing of accounts and records of the Dis[rict relating to such work. All <br />costs incurred by the United States shall be held to the minimum amount deemed <br />necessary by the Contracting Officer for protection of the interests of the <br />United States. After the execution of this contract and until completion of <br />the work hereunder, the United States shall furnish to the District quarterly <br />reports of all such costa incurred. <br />COST REAUCTIONS <br />9. (a) All costs incurred by the District in the performance of work <br />under this contract shall be held to the minimum amount necessary to complete <br />the approved Proposal in accordance with sound engineering, construction, and <br />business practices. As a meana of encouraging such objectives, certain cost <br />incentives are herein provided by this article. Each cost reduction action <br />taken by the District which results in the actual Pro�ect cost being less than <br />the estimated Project cost of $16,137,000, as shown in the approved Proposal, <br />is subject to the provisions of this ariicle; Provided, That the following <br />conditions are met: <br />(1) The District notifies the Contracting Officer, in writing, <br />of the proposed cost reduction action prior to its implementation. Said <br />notification shall include (a) a description of the proposed action, and (b) an <br />itemized and detailed estimate of the anticipated cost savings. <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.