My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00110
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00110
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/27/2010 9:23:47 AM
Creation date
10/5/2006 11:36:14 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153491
Contractor Name
Upper Yampa Water Conservancy District
Contract Type
Loan
Water District
0
County
Routt
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
, ( � � <br />the defense and protection of the water aupply and the Diatrict's rights <br />theieto. <br />(c) The District now holds or will acquire without cost to the <br />United Statea, all Federal, State, and local permits necessary for construction, <br />operation, and maintenance of the Pro,ject Works. <br />(d) The Diatrict will comply with the preference requirements of <br />Section 5(f) of the Act in regard to ihe sale of electric energy from the <br />Project Worka. <br />(e) The District will comply with the provisions of the Final <br />Environmental Impact Statement for the Stagecoach Reservoir Project (No. INT. <br />FES 86-30) and the signed Environmental Commitment Plan which is attached as <br />Exhibit A and hereby becomes part of this contract. <br />(f) The District will comply with such requirements of the Federal <br />Office of Management and Budget Circular No. A-102 as revised January 1981 as <br />the Secretary may determine to apply to the administration of grant funds <br />provided under the terms of this contract. <br />COSTS OF THE UNITED STATES <br />8. All costs incurred by the United States for examination of the <br />District's proposal, surveys, investigations, contract negotiations, and <br />Project construction, if any; administration of this contract, and the <br />reasonable cost of any plans, apecifications, and unpublished material <br />furnished to the District by the United States, are to be included in the <br />amount of the loan obligation. The term "cost" includes, without being <br />12 <br />
The URL can be used to link to this page
Your browser does not support the video tag.