Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I . <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />..liII <br />~ <br /> <br />~ <br /> <br />~ <br /> <br />A <br /> <br />Item <br /> <br />1. <br /> <br />Water Treatment Facility <br /> <br />Concrete <br /> <br />Mechanical Scrapers <br /> <br />Motor-contro1 panel <br /> <br />Piping <br /> <br />Electric power drop <br /> <br />Heating <br /> <br />Building foundation <br /> <br />Steel building erected <br /> <br />2. <br /> <br />Spring Collecting Drain Line <br /> <br />Road access repair <br /> <br />Excavation and drain line <br /> <br />Backfill drain material <br /> <br />Masonry collecting dams <br /> <br />3 - concrete and boulder <br />construction <br /> <br />3 - piping <br />Grubbing <br /> <br />Fencing of spring area <br /> <br />Estimated Costs <br /> <br />Quantity <br /> <br />168 c.y. <br />120 l. f. <br /> <br />1 each <br /> <br />1 each <br /> <br />1 each <br /> <br />1 each <br /> <br />182 l.f. <br /> <br />1,798 sq.ft. <br />SUB-TOTAL: <br /> <br />4 miles <br /> <br />2,000 l.f. <br /> <br />2,000 1.f. <br /> <br />8 c.y. <br /> <br />50 l.f. <br /> <br />3 acres <br /> <br />2,200 l.f. <br /> <br />SUB-TOTAL: <br /> <br />27 <br /> <br />Unit <br />Cost <br /> <br />200.00 <br /> <br />20.00 <br /> <br />3,500.00 <br /> <br />2,138.00 <br /> <br />2,600.00 <br /> <br />400.00 <br /> <br />8.24 <br /> <br />19.00 <br /> <br />5,115.00 <br /> <br />7.20 <br /> <br />2.00 <br /> <br />200.00 <br /> <br />10.50 <br /> <br />1,635.00 <br /> <br />6.30 <br /> <br />Amount <br /> <br />33,600 <br /> <br />2,400 <br /> <br />3,500 <br />2,138 <br /> <br />2,600 <br /> <br />400 <br /> <br />1,500 <br /> <br />34,162 <br /> <br />$80,300 <br /> <br />------- <br />------- <br /> <br />20,460 <br /> <br />14,400 <br /> <br />4,000 <br /> <br />4,800 <br /> <br />1,575 <br /> <br />4,905 <br /> <br />13,860 <br /> <br />$64,000 <br /> <br />------- <br />------- <br />