Laserfiche WebLink
<br />I <br />I Unit <br /> Item Quantity Cost Amount <br />I 3. Earth coverage on Collection line 2,000 l.f. 6.00 12,000 <br /> SUB-TOTAL: $12,000 <br /> 4. Move in-town storage tank ------- <br />I ------- <br /> Foundation wall - 24 ft. dia. 39 c.y. 180.00 7,020 <br />I Excavation 40 c.y. 22.25 890 <br /> Tear down and erect tank 1 each 9,000.00 9,000 <br />I Piping to system 500 l.f. 10.50 5,250 <br />I Insulated tank covers for <br /> 2 - 24 ft. dia. tanks 2 each 11,308.00 22,616 <br /> SUB-TOTAL: $44,776 <br />I ------- <br /> ------- <br /> 5. Install new 5/8 x 3/4" water <br />I meters - includes meter and <br /> insulated meter pits 80 each 150.00 12,000 <br /> SUB-TOTAL: $12,000 <br />I -------- <br /> -------- <br /> 6. Install 6 inch ductile iron pipe <br />I water line 14,210 l.f. 10.50 149,205 <br /> 17 fire hydrants 17 <br /> each 870.00 14,790 <br />I 6 inch gate valves 15 each 365.00 5,500 <br /> SUB-TOTAL: $169,495 <br />I ---------- <br /> ---------- <br /> 7. Construct new 1 mi l. gal. <br />I water storage tank 1 each 280,000.00 280,000 <br /> SUB-TOTAL: $280.000 <br /> -------- <br />I -------- <br /> <br />A <br /> <br />... <br /> <br />... <br /> <br />28 <br /> <br />A <br />