Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Total Construction Costs <br />Design Engineering at 12% <br />Construction Inspection at 7% <br />Construction Surveying at 4% <br />Administration at 10% <br /> <br />Total: <br /> <br />$662,571 <br />79,508 <br />46,379 <br />26,502 <br />66,257 <br />$881,217 <br />$20,000 <br /> <br />Water Rights Cost <br /> <br />This budget amount would be too large for the Town of <br />Starkville, therefore, a phase construction is outlined as im- <br />mediate essential elements and long-term elements. In the cost <br />estimate, items 1 - 3 are irr~ediate needs providing the following <br />revisions in the Total Budget: <br /> <br />PHASE I. <br /> <br />Construction Costs <br />Design Engineering at 12% <br />Construction Inspection at 7% <br />Construction Surveying at 4% <br />Administration at 10% <br /> <br />Total: <br /> <br />$156,300 <br /> <br />18,755 <br /> <br />10,941 <br />6,252 <br />15,630 <br />$207,878 <br /> <br />PHASE II. <br /> <br />Construction Costs <br />Design Engineering at 12% <br />Construction Inspection at 7% <br />Construction Surveying at 4% <br />Administration at 10% <br /> <br />Total: <br /> <br />$506,271 <br />60,752 <br />35,438 <br /> <br />20,250 <br />50,627 <br />$673,338 <br /> <br />$881,216 <br /> <br />. <br />. <br /> <br />Phase I and II <br /> <br />-------- <br />-------- <br /> <br />~ <br /> <br />26 <br /> <br />.. <br />