Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />= <br /> <br />CHAPTER VI <br /> <br />ESTIMATED COSTS <br /> <br />The construction cost estimates were derived using two <br />sources of data: 1) Building Construction Costs data, 1977, <br />by Robert Snow Means Co., and Colorado Contractors Bid Listing <br />of 1977. It is our opinion that the work on the springs and <br />upper flow dams will be more costly due to the isolation and in- <br />accessibility of this area. <br /> <br />SUMMARY OF ESTIMATED COSTS <br /> <br />Item <br /> <br />Costs <br /> <br />1. <br /> <br />Water treatment facility for turbidity, <br />odor, taste, chlorination <br /> <br />$80,300 <br /> <br />2. <br /> <br />Spring collecting drains line <br /> <br />64,000 <br /> <br />3. <br /> <br />Earth coverage on 2000' collection line <br />for freezing control <br /> <br />12,000 <br /> <br />4. <br /> <br />Increase potable storage by moving tank and <br />placing two (2) tank covers <br /> <br />44,776 <br /> <br />5. <br /> <br />Install new meters <br /> <br />12,000 <br /> <br />6. <br /> <br />Install new 6 inch distribution line <br /> <br />169,495 <br /> <br />7. <br /> <br />Construct new raw water storage <br /> <br />280,000 <br /> <br />Sub-Total: <br /> <br />$662,571 <br /> <br />25 <br />