My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00106
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00106
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:59 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Task 4. Evaluation of Plan Elements with Respect to Social Issues <br />Task 5. Evaluation of Plan Elements with Respect to Environmental <br /> Impacts <br />Task 6. Evaluation of Vater Treatment Issues <br />Task 7. Formulation of Alternatives <br />Task 8. Evaluation of Alternatives with Respect to Yield and Cost <br />Task 9. Evaluation of Alternatives with Respect to Social Issues <br />Task 10. Evaluation of Alternatives with Respect to Environmental <br /> Impacts <br />Task ll. Presentation of the Interim Phase II Report <br />Task 12. Presentation of Final Phase II Report <br /> <br />The first ten tasks of the Phase II study have been completed. Following a <br /> <br /> <br />four (4) week period for City and public review of this Interim Report, the <br /> <br /> <br />public hearing will be held to receive final comments and input on the <br /> <br />Study. After final comments have been received, the Final Report will be <br /> <br />produced and presented to the City Council and Vater Board. <br /> <br />1.3 REPORT ORGANIZATION <br /> <br />I <br />I <br />I <br /> <br />Tasks 2 through 10, above, were conducted in sequence during the Phase II <br /> <br /> <br />study. Public participation (Task 1) was integrated into the work effort <br /> <br /> <br />throughout the study. This report is organized in a similar manner in that <br /> <br /> <br />it presents a sequential discussion of the results from the individual <br /> <br /> <br />tasks. <br /> <br />I <br />I <br /> <br />I <br />I <br /> <br />1-8 <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.