Laserfiche WebLink
<br />I 0 <br />. <br />" ~ <br />II <br />I <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br /> <br />. <br /> <br />. <br /> <br />4. The City's ownership of irrigation and ditch company shares would <br />be as follows: <br /> <br /> No. of Shares <br /> Representing <br />Di tch No. of ShareS Owned by the City 100% Ownership <br />Home Supply 400 2001 <br />South Side 260 265 <br />Louden 340 600 <br />George Rist 170 200 <br />Barnes 1974 2012.5 <br />Chubbuck 1300 1590 <br />Big Thompson 19 21.5 <br />Farmers 20 30 <br />Greeley-Loveland Company 130 1636 <br />Seven Lakes 130 400 <br />Lake Loveland 65 300 <br />Ryan Gulch 25 100 <br />Rist and Goss 3 3 <br /> <br />Silver Lake (a.k.a. Cemetery Lake) is privately owned and is not included <br />in this Plan of Study. <br /> <br />Hereafter, the term Design Condition will be used to refer to the above set <br />of demand and supply conditions and evaluations of the water supply surplus <br />or deficit corresponding to the 100-year recurrence interval. <br /> <br />An overview of the Plan of Study for phase II and a description of the <br /> <br /> <br />specific study tasks that will be performed are presented in the following <br /> <br /> <br />sections. <br /> <br />1-3 <br />