My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I 0 <br />. <br />" <br />, <br />II <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />PHASE II - TASK 7: FORlWLATION OF <br />ALTERNATIVES <br /> <br />TASK DESCRIPTION: <br /> <br />will be <br /> <br />Three (3) multi-element alternatives <br />formulated for further analyses. <br /> <br />TASK OBJECTIVE: <br /> <br />The objective of Task 7 is to formulate multi-element <br />alternatives from the results of Tasks 2 through 5. <br /> <br />METHODOLOGY: <br /> <br />CDM will meet with City and State staff to formulate <br />three (3) multi-element alternatives. These <br />alternatives will consist of a combination of two or <br />more of the plan Elements previously analyzed. The <br />three multi-element alternatives will be evaluated in <br />the same manner as the individual Plan Elements as <br />described in tasks 8 through 10. It is assumed for <br />costing purposes that only one meeting will be <br />required to formulate the 3 alternatives, and that <br />the analyses of multi-element alternatives will not <br />require modifications to the models beyond those <br />made in earlier tasks. <br /> <br />TASK DELIVERABLES: <br /> <br />The report will be updated to include a discussion of <br />the multi-ele~ent alternatives formulated and <br />supporting rationale. <br /> <br />3-19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.