My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br />I <br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />I <br />II <br />II <br />I <br />I <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />PHASE II - TASK 2: EVALUATION OF <br />OPERATIONAL FACTORS (cont.) <br /> <br />4. COM viII make appropriate revisions to the vater supply model(s) <br />developed in Phase I to reflect the impact of the potential <br />constraints defined in Steps 1 through 3 above. It is assumed that <br />explicit simulation of east slope CST storage facilities (ex., <br />Horsetooth, Flatiron, and Carter reservoirs) viII not be required. <br /> <br />5. The revised simulation model(s) viII be run using the 1,OOO-year <br />hydrologic records developed in Phase I to determine the system <br />yield under the Design Conditions. <br /> <br />TASK DELIVERABLES: <br /> <br />A report section viII be prepared vhich provides: <br /> <br />1. A narrative summary of the potential constraints identified in this <br />Task; <br /> <br />2. A narrative description of hov these constraints vere represented <br />in the determination of syste~ yield; and <br /> <br />3. A revised estimate of the magnitude of the deficit that is expected <br />under the Design Condition~, subject to the operational and <br />transmission capacity constraints identified in this task. <br /> <br />3-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.