Laserfiche WebLink
<br />I <br />II <br />I <br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />I <br />II <br />II <br />I <br />I <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />PHASE II - TASK 2: EVALUATION OF <br />OPERATIONAL FACTORS (cont.) <br /> <br />4. COM viII make appropriate revisions to the vater supply model(s) <br />developed in Phase I to reflect the impact of the potential <br />constraints defined in Steps 1 through 3 above. It is assumed that <br />explicit simulation of east slope CST storage facilities (ex., <br />Horsetooth, Flatiron, and Carter reservoirs) viII not be required. <br /> <br />5. The revised simulation model(s) viII be run using the 1,OOO-year <br />hydrologic records developed in Phase I to determine the system <br />yield under the Design Conditions. <br /> <br />TASK DELIVERABLES: <br /> <br />A report section viII be prepared vhich provides: <br /> <br />1. A narrative summary of the potential constraints identified in this <br />Task; <br /> <br />2. A narrative description of hov these constraints vere represented <br />in the determination of syste~ yield; and <br /> <br />3. A revised estimate of the magnitude of the deficit that is expected <br />under the Design Condition~, subject to the operational and <br />transmission capacity constraints identified in this task. <br /> <br />3-4 <br />