My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />II <br />I <br />I <br />I <br />II <br />I <br />I <br />II <br />I <br />II <br />I <br />II <br />II <br />I <br />I <br />I <br />I <br />I <br /> <br />o <br /> <br />. <br /> <br />. <br /> <br />PHASE II - TASK 2: EVALUATION OF <br />OPERATIONAL FACTORS <br /> <br />TASK DESCRIPTION: <br /> <br />This task will assess the impact on total system <br />yield of the following potential operational or <br />transmission c~pacity constraints: <br /> <br />1. Transmission capacity of the Dille Tunnel <br /> <br />2. Transmission capacity of the Charles Hansen Feeder Canal <br /> <br />3. Operation of CBT storage facilities relative to average yield from <br />Vindy Gap Project <br /> <br />TASK OBJECTIVE: <br /> <br />The objective of Task 2 is to determine the total <br />yield of Loveland's four (4) major water supply <br />sources for ~he Design Conditions subject to the <br />potential cons~raints identified above. <br /> <br />HETBODOLOGY: <br /> <br />1. CDM will meet with the City staff, NCVCD staff and personnel of the <br />U.S. Bureau of Reclamation (BUREC) to review and discuss available <br />data concerning conveyance capacities and operational constraints <br />for the Dille Tunnel and the Charles Hansen Feeder Canal. One <br />meeting is assumed for budgeting purposes. <br /> <br />2. CDM and City staff will also meet with NCVCD personnel to <br />determine: <br /> <br />a. the quantity of storage capacity in each CBT facility that may <br />be devoted to storage of Vindy Gap water. <br /> <br />b. the operational policy to be used by the NCVCD in allocating <br />CBr storage capacity to vindy Gap water. <br /> <br />3. Daily flow rates through the Dille Tunnel and Charles Hansen Canal <br />will be obtained for the period from 1977 through 1985. These flow <br />rates will be evaluated to determine the excess capacity that may <br />be available to deliver City-owned "ditch water" to the Green Ridge <br />Glade and Maitland Canyon reservoir sites. <br /> <br />3-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.