Laserfiche WebLink
<br />I ~ <br />. <br />, <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />II <br />I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />PHASE II - TASK 3: EVALUATION OF <br />PLAN ELEMENTS VITB RESPECT TO nEW <br />AND COST <br /> <br />TASK DESCRIPTION: <br /> <br />Individual p~an Elements (i.e., single-element <br />alternatives) will be evaluated to determine the <br />potential supply benefits and the estimated cost of <br />implementation. The following Plan Elements will be <br />considered: <br /> <br />1. Vater Conservation Measure9 as they may affect summer and winter <br />water usage. <br /> <br />2. Adjudication of a new direct-flow right on the Big Thompson River <br />to utilize "free" water as available. <br /> <br />3. Additional reservoir storage capacity at Green Ridge Glade. <br /> <br />4. Additional reservoir storage capacity at Maitland Canyon, this <br />evaluation will include preparation of topographic mapping for this <br />site at a scale of 1 inch = 200 feet. <br /> <br />5. Reservoirs at both sites (a maximum of three combinations will be <br />evalua ted) . <br /> <br />6. Acquisition of additional CBT units. <br /> <br />7. Acquisition of additional Vindy Gap units. <br /> <br />8. Acquisition of additional No.1 or No.2 direct-flow rights on the <br />Big Thompson River or acquisition of specific ditch companies as <br />outlined in the Task Methodology below. <br /> <br />9. Reuse of Vindy Gap water and stored transfer decree water. <br /> <br />10. Development of ground water resources. <br /> <br />11. Municipal-agricultural annual lease agreements. <br /> <br />3-5 <br />