My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00096
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00096
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:06 AM
Creation date
10/5/2006 11:35:39 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153494
Contractor Name
Loveland, City of
Water District
0
County
Larimer
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
66
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I ~ <br />. <br />, <br />, <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />II <br />I <br />I <br />II <br />I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />PHASE II - TASK 3: EVALUATION OF <br />PLAN ELEMENTS VITB RESPECT TO nEW <br />AND COST <br /> <br />TASK DESCRIPTION: <br /> <br />Individual p~an Elements (i.e., single-element <br />alternatives) will be evaluated to determine the <br />potential supply benefits and the estimated cost of <br />implementation. The following Plan Elements will be <br />considered: <br /> <br />1. Vater Conservation Measure9 as they may affect summer and winter <br />water usage. <br /> <br />2. Adjudication of a new direct-flow right on the Big Thompson River <br />to utilize "free" water as available. <br /> <br />3. Additional reservoir storage capacity at Green Ridge Glade. <br /> <br />4. Additional reservoir storage capacity at Maitland Canyon, this <br />evaluation will include preparation of topographic mapping for this <br />site at a scale of 1 inch = 200 feet. <br /> <br />5. Reservoirs at both sites (a maximum of three combinations will be <br />evalua ted) . <br /> <br />6. Acquisition of additional CBT units. <br /> <br />7. Acquisition of additional Vindy Gap units. <br /> <br />8. Acquisition of additional No.1 or No.2 direct-flow rights on the <br />Big Thompson River or acquisition of specific ditch companies as <br />outlined in the Task Methodology below. <br /> <br />9. Reuse of Vindy Gap water and stored transfer decree water. <br /> <br />10. Development of ground water resources. <br /> <br />11. Municipal-agricultural annual lease agreements. <br /> <br />3-5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.