My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00092
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:35:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153412
Contractor Name
Louisville, City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />6 <br /> <br /> <br />3. Require all Subcontractors to indemnify the State and <br />the Contractor against all liability and loss. and against all <br />claims and. act ions based upon or arising out of damage or <br />injury, including death, to persons or property caused by or <br />sustained in connection with the perfonmance of any sUbcontract <br />or by conditions created thereby, or based upOn a~y violation <br />of any statute, ordinance. or regulation, and the defense of <br />any such claims or actions. <br /> <br />4. Require all Subcontractors to maintain liability <br />insurance in at least the following amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($150,000). <br /> <br />b. For any injury to two or llllOre persons in any <br />single occurrence, the S~ 'of Four Hundred Thousand <br />Dollars ($400,000). <br /> <br />said liability insurance shall name the Contractor and <br />the State as co-insureds. No payments shall be made under this <br />contract Wlless a copy of a certificate of said liability <br />insurance has been filed with the COlorado Water COnservation <br />Board. <br /> <br />5. Conveyor cause title to be conveyed by warranty deed <br />to the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, the following portions of the <br />proposed project facilities within thirty (30) days of their <br />completion: <br /> <br />An undivided SO percent partion of the following: <br /> <br />a. A dam embankment to be constructed over the <br />existing Harper Lake embankment fran approximately the <br />following materials, between stations 0+00 to 24+00; <br /> <br />(1 ) 68,770 + cubic yards of pervious fill. <br />(2) 73,100 + cubic yards of impervious fill. <br />(3) 6.800 + cub ic yards of gravel bedding. <br />(4) 13,600 + cubic yards of riprap. <br />(5) 1,700 + cubic yards of road base. <br /> <br />b. A 36-inch CMP Spillway about 4S feet 1003 in the <br />most northeastern corner of the reservoir embankment <br />and about 1380 feet east of 80th Street and 550 feet <br />south of the Hillborough West subdivision. <br /> <br />c. About 650 acre-feet of water storage within the <br />present Harper Lake reservoir, storage to be created <br />by the removal of about 1,080,100 cubic yards of dirt <br />in the Harper reservoir area. <br /> <br />d. About 1700 feet of 36-inch RCP to replace and <br />relocate the existing Louisville lateral around the <br />western Shoreline. <br /> <br />e. A pumping station and associated facilities as <br />follows: <br /> <br />(1) Two mixed-flow pumps, 20 horsepo~r each, of <br />a total capacity of about ~7 cfs. <br /> <br />(2) A lS-foot-by-20-foot-sized building to house <br />above-mentioned pumps and other pertinent <br />appurtenances. <br /> <br />f. The Harper Lake inlet structure with all <br />appurtenances, including about 1200 feet of 12-inch <br /> <br />Page ~ of l! pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.