Laserfiche WebLink
<br />DEPA <br /> <br />10 <br />GENCY NlIM8E1l <br /> <br />5 <br /> <br />". Forfn6-A.C:.O.U.. <br /> <br /> <br />CONTRACT <br /> <br />THIS CONTRACT. m;lde Ihis 1st day of August <br /> <br />St(lt~ of Colorado for the use: and benefit of the Department of "1 <br />Colorado Water Conservation Board) <br /> <br />M~in.(terrefettedtoastheStlte and'2 the City of Louisv1.11e. <br />749 Main Street, Louisville, Colorado 80227, <br /> <br />herein.rter teferrtd to 15 the contractor, <br /> <br />1983, by and betweea tbe <br />Natural Resources <br /> <br />WHEREAS. authority exists in the Law and FuPds haw been budaeted, appropriated &ad oth""'~ made <br />....ll.bl< ..d. ,uflk;"'~ ,,,,.,,,mbe..d boI..", th=of .....~/!~bl. fo'~m"1I in Fund Number 400B . <br />. elL Acc:ou". NUlllber~. Contract ~umbrance Num !S"~.~ <br />ABL Account NurnDer 14070, org. unit 7- 7- 1~-- <br />WHER.EAS, required .pproval. dearance. and coordination has been accomplished from and with appropriate <br />agencies; and <br /> <br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended. the State is authorized to <br />construct certain water projects for the benefit of the people <br />of the State~ and <br /> <br /> <br />W~EREAS, the Contractor is a City'in the State of Colorado <br />and wishes to improve its present r~ water storage, herein- <br />after called the project, for the citizens of the City of <br />Louisville in Boulder County, Colorado, at an estUnated cost of <br />Tnree Million Five Hundred Sixty-TwO Thousand Dollars <br />1$3.562.000), and <br /> <br />WHEREAS, a feasibility investigat.ion of said project was <br />conducted and it was found that such a project is economically <br />feasible: and <br /> <br />WHEREAS. the State has agreed to~nstruc...Ad project and <br />to sell the same to the Contractor u f'~~;~ eeable <br />terms and conditions. subject to th ..( Vbili. y f ding <br /> <br />for t::R:::~:::.:::t to House Bill No. lIJ,?f~Uty- . th <br /> <br />General Assembly of the State of Colorado, ~ry~n~ted into <br />law, the colorado Water Conservation Board has ~en~Jhor ized <br />to expend a sum not to exceed One Million Seven H...., r <br />Eighty-One Thousand Dollars ($1,781,000) for canst" n of <br />the project: ' <br /> <br />NOW THEREFORE, in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br /> <br />A. The COntractor agrees that it shall: <br /> <br />1. Employ an engineering finn to prepare project plans <br />and specifications for the proposed p1:oject. Both the <br />engineering firm and the project plans and specifications shall <br />be approved by the State. <br /> <br /> <br />2. Subcontract the construction of said project to a <br />responsible and capable firm, said project to. be canpleted <br />within two (2) years of the date of this contract in accordance <br />with the project plans and specifications and any necessary <br />modification thereof approved by the State. The State must <br />approve, in writing, all subcontracts before they become <br />effective. The above-mentioned time may be extended by the <br />State if such time is insufficient because of acts of. God or <br />other acts or circumstances beyond the control of the <br />Contractor. <br /> <br />395-53..oI.cOl0 <br /> <br />""'1 of~..'" <br />.C$eo iutrue1ioru on reta. or lase pip.) <br /> <br />102 <br />c/louis <br />