My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00092
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00092
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:01:58 AM
Creation date
10/5/2006 11:35:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153412
Contractor Name
Louisville, City of
Contract Type
Loan
Water District
6
County
Boulder
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />P. <br />.. <br />.: , <br /> <br />7 <br /> <br />steel inlet pipe connected to the existing Eldorado <br />Springs pipeline. <br /> <br />g. A gravity outlet structure with all appurtenances. <br />including about BOO feet of 24-inch RCP. <br /> <br />The warranty deed must be recorded by the Contractor <br />in the proper county or counties and all transfer taxes shall <br />be paid by the Contractor. . <br /> <br />6. Permit periodic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />7. Without expense to the State, manage, operate. and <br />maintain the project system continuously in an efficient and <br />economical manner, and assume all legal liability for such <br />management, operation, and maintenance. The Contractor agrees <br />to indemnify and hold t1\e State hannless fran any liability as <br />a result of the State's ownership of the project facilities <br />identified in paragraph 5 above. The Contractor shall maintain <br />general liability insurance covering the management, operation, <br />and maintenance of the project system until it has completed <br />purchase of the project system from the State in at least the <br />fOllowing amounts: <br /> <br />8. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars l~150,OOO). <br /> <br />b. For any inj ury to two or ItK)re persons in any <br />single occurrence, the sum of Four Hundred Thousand <br />Dollars l~400,OOO). <br /> <br />Said liability insurance shall name the State as a <br />co-insured. A copy of a certificate of said liability <br />insurance must be filed with the Colorado Water Conservation <br />Board prior to the start of tne operation of the project <br />system . <br /> <br />8. Make the services of said project available within its <br />capacity to all persons in the Contractor's service area <br />without discrimination as to race, color, religion, or natural <br />origin at reasonable charges including assessments, .taxes, or <br />fees in accordance with a schedule of such charges, whether for <br />one or more classes of service, formally adopted by the <br />Contractor through its board of directors, as may be modified <br />from time to time by the Contractor. The initial rate schedule <br />must be approved by the State. Thereafter, the Contractor may, <br />subject to the approval of the State, make such mdifications ~ <br />to the rate schedule as the Contractor deems necessary to <br />efficiently and economically provide for the financial <br />requirements of the system as long as the rate schedule renains <br />reasonable and non-discriminatory. <br /> <br />9. Adjust its operating costs and service charges from <br />time to time to provide for adequate operation and maintenance, <br />emergency repair services, obsolescence reserves, and debt <br />reserves. <br /> <br />10. Expand the systen from time to time to meet reasonable <br />growth or ser~ice requirements in the area within its <br />jurisdiction. <br /> <br />11. Provide the State with such periodic repOrts as it may <br />require and permit periodic inspections of its operations and <br />accounts by a designated representative of the State. <br /> <br />12. Purchase frcm the State all of the State's right, <br />title, and interest in said project and any facilities thereof <br /> <br />Page 3 of ! pages <br />
The URL can be used to link to this page
Your browser does not support the video tag.