Laserfiche WebLink
<br />Table VI - B <br />ESTI~mTES OF CONSTRUCTION COSTS <br />Summit Reservoir ond Irrigation Company <br /> <br />Item <br /> <br />Quantity <br /> <br />1. Ground Recontouring <br />Crawler tractor 70 <br />Backhoe 20 <br />6" Parshall flumes 4 <br />Install flumes 4 <br />Contingencies (20%) <br />Subtotal <br />Engineering & inspection <br />Total Item 1 <br /> <br />2. Raise Dike Crest <br />Excavation & haul 140 <br />. Backfill 140 <br />Contingencies (20%) <br />subtotal <br />Engineering & Inspection <br />Total Item 2 <br /> <br />3. Abandon Outlet <br />Backhoe 4 <br />Common Excavation 330 <br />. Common Backfill 330 <br />Filter Material 60 <br />Filter Backfill 60 <br />Furnisn & Install <br />Drain Pipe 90 <br />Contingencies (20%) <br />Subtotal <br />Engineering & Inspection <br />Total Item 3 <br /> <br />4. Middle South Dike Filter <br />Filter Material 1075 <br />Filter Backfill 1075 <br />Common Excavation 3220 <br />Common Backfill 3220 <br />Furnish &. Install <br />Drain Pipe 400 <br />Contingency (20%) <br />subtotal. <br />Engineering & Inspection <br />Total Item 4 <br /> <br />Unit <br /> <br />hours <br />hours <br />ea. <br />ea. <br /> <br />cy <br />cy <br /> <br />hrs. <br />cy <br />cy <br />cy <br />cy <br /> <br />Feet <br /> <br />cy <br />cy <br />cy <br />cy <br /> <br />Feet <br /> <br />-33- <br /> <br />Unit Cost <br /> <br />$ 75.00 <br />35.00 <br />220.00 <br />100.00 <br /> <br />6.00 <br />5.00 <br /> <br />35.00 <br />4.00 <br />3.00 <br />15.00 <br />6.00 <br /> <br />3.00 <br /> <br />15.00 <br />4.00 <br />4.00 <br />2.00 <br /> <br />3.00 <br /> <br />Total <br /> <br />$5,250.00 <br />700.00 <br />880.00 <br />400.00 <br />1,446.00 <br />$8,676.00 <br />1,106.00 <br />$9,782.00 <br /> <br />$ 840.00 <br />700.00 <br />308.00 <br />$1,848.00 <br />560.00 <br />$2,408.00 <br /> <br />$ 140.00 <br />1,320.00 <br />990.00 <br />900.00 <br />'360.00 <br /> <br />270.00 <br />796.00 <br />$4,776.00 <br />400.00 <br />$5,176.00 <br /> <br />16,125.06 <br />4,300.00 <br />12,880.00 <br />6,440.00 <br /> <br />1,200.00 <br />8,189.00 <br />$49,134.00 <br />3,500.00 <br />$52,634.00 <br />