Laserfiche WebLink
<br />Cost Estimate <br /> <br />The estimated total proiect cost for the selected project is $248,633.72. The Natural <br />Resources Conservation Service (NRCS) will provide project planning and engineering <br />design. <br /> <br />Item <br /> <br />Estimated Cost <br /> <br />1. Planning and Design Costs by NRCS <br />2. Construction Cost <br /> <br />Total Cost <br /> <br />$ 0 <br />$248,633 <br />$248,633 <br /> <br />The NRCS cost estimate is included in Appendix B. <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the project: <br />Tarcet <br />Task ComDletion Date <br /> <br />1. Complete Final Design <br />2. NRCS Approves Design <br />3. Start Construction <br />4. Complete Construction <br />5. Project is Operational <br /> <br />12/01/01 <br />12/15/01 <br />01/01/02 <br />03/15/02 <br />04/15/02 <br /> <br />Social, Economic, and Physical Impacts <br /> <br />The project will have no significant social impacts. <br /> <br />Members at the lower end of the Appleton Northwest Lateral (ML 369) will have enough <br />water in low water years to adequately irrigate their crops. <br /> <br />The project will have no significant physical impacts once construction is complete. <br />The new diversion structure will be very similar to what exists now, and the new <br />pipeline will be buried and out of view. <br /> <br />Feasibility Study <br />Rehabilitation of the Appleton Northwest Lateral (ML 369) & Dxainage Corporation <br />september 1997 <br />