My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00068
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153021
Contractor Name
Rangely, Town of
Contract Type
Grant
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MciNTIRE <br />& <br />QUIROS <br /> <br />OF <br />COLORADO <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />September 10, 1975 <br />Page 5 <br /> <br />Water Supply Engineer - 200 hrs. @ $22/hr. = $4,400.00 <br /> <br />d. Structure Plans -~ This will be a brief discussion of the type of <br />structures which will need to be constructed, and materials to be <br />used for all structures. <br /> <br />Structural Engineer - 20 hrs. @ $22/hr. = $440.00 <br /> <br />e. Drainage -- Only a brief discussion on.drainage wi~l be included. <br />This will be a discussion on how drainage will be treated on the <br />treatment plant and storage reservoir sites. <br /> <br />Drainage Engineer - I hr. @ $22/hr= $22.00 <br />Project Engineer - I hr. @ $22/hr = $22.00 <br /> <br />f. Right-of-Way-- This section will discuss right-of-way requirements, <br />right-of-way availability, and describe all necessary rights-of-way <br />not yet acquired. <br /> <br />Project Manager - 4 hrs. @ $22/hr. = $88.00 <br />Chief-of-Surveys - 4 hrs. @ $22/hr. = $88.00 <br /> <br />g. Evaluate the combined effect of total water development as proposed, <br />including part to be financed by E.D.A. money - 20 hrs. @ $22/hr = $440.00 <br /> <br />VI I. Estimated Costs <br /> <br />a. Cost of Construction -- .All construction cost estimates wi I I be based <br />on the average unit prices obtained from contractor cost surveys, with <br />factors such as construction in existing streets, and in remote areas <br />being considered. Costs for all construction items will be. tabulated. <br />A 20%. contingency will be provided, and an inflation factor determined <br />by consul t i ng government reports. Eng i neer i ng, I ega I, and adm in i stra- <br />tive costs will be considered and tabulated. Interest costs will be <br />projected and included. <br /> <br />Project Manager - 40 hrs. @ $22/hr. = $880.00 <br />Research assistant - 20 hrs. @ $18/hr = $360.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.