Laserfiche WebLink
<br />MciNTIRE <br />& <br />QUIROS <br /> <br />OF <br />COLORADO <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />September 10, 1975 <br />Page 5 <br /> <br />Water Supply Engineer - 200 hrs. @ $22/hr. = $4,400.00 <br /> <br />d. Structure Plans -~ This will be a brief discussion of the type of <br />structures which will need to be constructed, and materials to be <br />used for all structures. <br /> <br />Structural Engineer - 20 hrs. @ $22/hr. = $440.00 <br /> <br />e. Drainage -- Only a brief discussion on.drainage wi~l be included. <br />This will be a discussion on how drainage will be treated on the <br />treatment plant and storage reservoir sites. <br /> <br />Drainage Engineer - I hr. @ $22/hr= $22.00 <br />Project Engineer - I hr. @ $22/hr = $22.00 <br /> <br />f. Right-of-Way-- This section will discuss right-of-way requirements, <br />right-of-way availability, and describe all necessary rights-of-way <br />not yet acquired. <br /> <br />Project Manager - 4 hrs. @ $22/hr. = $88.00 <br />Chief-of-Surveys - 4 hrs. @ $22/hr. = $88.00 <br /> <br />g. Evaluate the combined effect of total water development as proposed, <br />including part to be financed by E.D.A. money - 20 hrs. @ $22/hr = $440.00 <br /> <br />VI I. Estimated Costs <br /> <br />a. Cost of Construction -- .All construction cost estimates wi I I be based <br />on the average unit prices obtained from contractor cost surveys, with <br />factors such as construction in existing streets, and in remote areas <br />being considered. Costs for all construction items will be. tabulated. <br />A 20%. contingency will be provided, and an inflation factor determined <br />by consul t i ng government reports. Eng i neer i ng, I ega I, and adm in i stra- <br />tive costs will be considered and tabulated. Interest costs will be <br />projected and included. <br /> <br />Project Manager - 40 hrs. @ $22/hr. = $880.00 <br />Research assistant - 20 hrs. @ $18/hr = $360.00 <br />