My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00068
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153021
Contractor Name
Rangely, Town of
Contract Type
Grant
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MciNTIRE <br />& <br />QUIROS <br /> <br />OF <br />COLORADO <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />September 10, 1975 <br />Page 6 <br /> <br />b. Fund Requirement Schedule-- An amortization schedule will be <br />developed and supplied in the plan, showing construction ex- <br />penditure, operation and maintenance requirements, capital out- <br />1 ay, cap ita 1 .recovery, bond ret i rements, and revenues. <br /> <br />projectManager- 10 hrs. @ $22/hr. = $220.00 <br />Engineer - 20 hrs. @ $22/hr. = $440.00 <br />Draftsman - 3 hrs. @ $18/hr. = $54.00 <br /> <br />c. Operation, Maintenance and .Replacement Costs -- Costs wi 11 be <br />determined from past experience and from i.nterviews with the <br />Town Administrator, investigation of Town records, and interviews <br />with other towns with similar populations. All figures will be <br />tabulated. <br /> <br />Engineer -15 hrs. @ $22/hr. = $330.00 <br />Research assistant - 10 hrs. @ $22/hr = $220.00 <br /> <br />d. Emergency Operating Fund -- All information for this portion will <br />be obtained from the Town and incorporated into the report. <br /> <br />Project Manager - 3 hrs. @ $22/hr. = $66.00 <br /> <br />VII I.Project Evaluation <br /> <br />This information will be included as a part of the amortization schedule, <br />and be determined by discussions with a financial consultant. Also in- <br />cluded will be part of the project that will be financed by E.D.A. funds. <br /> <br />Project Manager - 16 hrs. @ $22/hr. = $352.00 <br /> <br />Total =$18,470.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.