My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00068
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00068
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:05 AM
Creation date
10/5/2006 11:33:54 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153021
Contractor Name
Rangely, Town of
Contract Type
Grant
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />MciNTIRE <br />& <br />QUIROS <br /> <br />OF <br />COLORADO <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />September I 0, 1975 <br />Page 4 <br /> <br />of water rights with present and future water rights under present <br />conditions, and an estimation of additional future requirements, <br />and safe yield, if possible. <br /> <br />Water Supply Engineer - 80 hrs. @ $22/hr. = $1,760.00 <br /> <br />e. Water Utilization -- For this portion, we wi 11 show the amount of <br />water avai labl.e to the project by .summarizing the previous information, <br />including a discussion.on the yellow Jacket project. <br /> <br />Water Supply Engineer - 60 hrs. @ $22/hr. = $1,320.00 <br />Project Manager - 4 hrs. @ $22/hrs. = $88.00 <br /> <br />f. Water Qual ity -- To accompl ish this portion of the project, water <br />samples will be taken and tested and a review of Public Health records <br />wi 11 be made. The information. wi 11 then be tabulated and a summary <br />prepared. <br /> <br />Water Supply Engineer - 40 hrs. @ $22/hr. = $880.00 <br />Project Manager - 4 hrs. @ $22/hr. = $88.00 <br /> <br />VI. Plan of Development <br /> <br />a. Physical Plan -- The Physical plan wi 11 be a written discertation <br />describing the existing and future facilities. <br /> <br />Water Department Manager - 40 hrs. @ $22/hr. = $880.00 <br /> <br />b. Geologic Investigations -- There will be a soils investigation at all <br />propos~d locations of structureS, and complete discussion of compactibility, <br />and location of water table as well as types .of recommended foundations, <br />and a complete log provided. . <br /> <br />Soils Engineer - 4 holes @ $200/test hole = $800.00 <br /> <br />c. Design Criteria -- A discussion of design criteria for all phases of <br />treatment plant design, pumping stations, pipelines and storage reservoirs <br />will be provided, along with source identification. <br />
The URL can be used to link to this page
Your browser does not support the video tag.