Laserfiche WebLink
<br />MciNTIRE <br />& <br />QUIROS <br /> <br />OF <br />COLORADO <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />September I 0, 1975 <br />Page 4 <br /> <br />of water rights with present and future water rights under present <br />conditions, and an estimation of additional future requirements, <br />and safe yield, if possible. <br /> <br />Water Supply Engineer - 80 hrs. @ $22/hr. = $1,760.00 <br /> <br />e. Water Utilization -- For this portion, we wi 11 show the amount of <br />water avai labl.e to the project by .summarizing the previous information, <br />including a discussion.on the yellow Jacket project. <br /> <br />Water Supply Engineer - 60 hrs. @ $22/hr. = $1,320.00 <br />Project Manager - 4 hrs. @ $22/hrs. = $88.00 <br /> <br />f. Water Qual ity -- To accompl ish this portion of the project, water <br />samples will be taken and tested and a review of Public Health records <br />wi 11 be made. The information. wi 11 then be tabulated and a summary <br />prepared. <br /> <br />Water Supply Engineer - 40 hrs. @ $22/hr. = $880.00 <br />Project Manager - 4 hrs. @ $22/hr. = $88.00 <br /> <br />VI. Plan of Development <br /> <br />a. Physical Plan -- The Physical plan wi 11 be a written discertation <br />describing the existing and future facilities. <br /> <br />Water Department Manager - 40 hrs. @ $22/hr. = $880.00 <br /> <br />b. Geologic Investigations -- There will be a soils investigation at all <br />propos~d locations of structureS, and complete discussion of compactibility, <br />and location of water table as well as types .of recommended foundations, <br />and a complete log provided. . <br /> <br />Soils Engineer - 4 holes @ $200/test hole = $800.00 <br /> <br />c. Design Criteria -- A discussion of design criteria for all phases of <br />treatment plant design, pumping stations, pipelines and storage reservoirs <br />will be provided, along with source identification. <br />