Laserfiche WebLink
<br />MciNTIRE <br />& <br />QUIROS <br /> <br />Mr. Nick loannides <br />Colorado Water Conservation Board <br />September 10, 1975 <br />Page 3. <br /> <br />OF <br />COLORADO <br /> <br />of the report. The land ownership section wi n be researched by an <br />M. & Q. research assistant and compiled by the Project Manager. <br /> <br />Project Manager time - 4 hrs. @ $22/hr. = $88.00 <br /> <br />V. Water <br /> <br />a. Requirements -- .Water requirements will be determined by using <br />establ ished averages for one or' two simi lar towns in the State, <br />and by examining the use figures of the Town, then developing <br />criteria that fits the Town. Domestic use, lawn irrigation, <br />and raw water. sales wi 11 all be considered. <br /> <br />Water Department Manager - 20 hrs. @ $22/hr. = $440.00 <br />Project Manager time ~ 4 hrs. @ $22/hr. = $88.00 <br /> <br />b. Surface Water Supply -- Stream. flow gauging station locations will <br />be reviewed and a station selected for analysis. . Copies of the last <br />ten years of diversion records wi 11 be tabulated along. with stream <br />flow data and an analysis made. The State Engineer will be contacted <br />to obtain information regarding future water uses along the White <br />River. <br /> <br />Water Supply Engineer - 24 hrs. @ $22/hr. = $528.00 <br /> <br />c. Ground Water Supply -- The ground water level will be investigated <br />to determine if ground water is a feasible supply source. Records <br />of private wells in the area, discussions. with local residents, and <br />review of available geologic information will also be accomplished. <br /> <br />Water Supply Engineer - 12 hrs. @ $22/hr. = $264.00. <br /> <br />d. Water Rights -~ The information that will be provided will be a list <br />of effective water rights, obtaining information from Town, a search <br />of County and 5.E.0. records, a tabulation of decree data, relation <br />