<br />2. EASTERN PORTAL <br /> <br />This item shall be paid for on a lump sum basis and shall include the cost of furnishing all equipment, labor, and <br />materials required to enlarge, improve, and stabilize eastern tunnel portal for safety and the equipment access <br />required for the underground work. The Contractor shall submit shop drawings detailing the proposed portal <br />improvements. The work may include, but is not limited to, the following items: portal widening, scaling, rock <br />reinforcement, shotcrete, steel ribs/lagging, temporary timber canopy. <br /> <br />3. CONCRETE INVERT AND PERMANENT RAIL <br /> <br />All equipment, labor, and materials required to place approximately 2,000 linear feet of concrete invert and <br />permanent rail extending from the eastern portal to Station 20+00. The work will include all required <br />dewatering, preparation and cleaning of 2,000 lineal feet of invert, hauling and placement of approximately 450 <br />yards' of fiber reinforced concrete, and installation of 2,000 lineal feel of rail compatible with the Contractor's <br />equipment and underground work plan. <br /> <br />These items shall be paid for on the following basis: <br /> <br />A. Invert Concrete: Per cubic yard placed and accepted by the Engineer. This item will be <br />measured using concrete truck tickets. <br /> <br />B. <br /> <br />Permanent Rail: Per lineal foot of tunnel installed and accepted by the Engineer. <br /> <br />{ <br /> <br />4. TEMPORARY RAIL EAST <br /> <br />All equipment, labor, and materials required to install and remove approximately 3,333 lineal feet of temporary <br />rail extending from Station 20+00 through the caved section at Station 53 + 33, The work includes ail ties, rails, <br />blocking, and shims necessary for a complete installation. <br /> <br />( <br />< <br /> <br />. <br />. <br /> <br />This item shall be paid for on a per lineal foot of tunnel basis installed and accepted by the Engineer. <br /> <br />5. REMINE TIMBER SECTION <br /> <br />C <br />t <br />( <br />f <br />t <br />( <br /> <br />All equipment, labor, and materials to remove existing timber support and remine 25 lineal feet of tunnel from <br />approximately Station 14 + 26 to Station 14 + 51. The work includes drilling up to 100 lineal feet of probe holes <br />to assess rock condit'lons, providing and installing approximately eight steel ribs with all required spiling, iagging, <br />cribbing, clamps, foot blocks, tie rods, and all accessories; and removal of associated muck. <br /> <br />A. The remining and support of the tunnel shall be paid for on a per lineal foot of tunnel basis <br />installed and accepted by the Engineer. <br /> <br />( <br /> <br />Section 01025 - Page 2 of 7 <br /> <br />10100 <br /> <br />4 <br />( <br />C <br />. <br />t <br />. <br />C <br />f <br />. <br />, <br />f <br />, <br />f <br /> <br />B. Probe holes shall be paid for on a per lineal foot basis accepted by the Engineer. <br /> <br />6. WIDEN TIMBER SUPPORTED SECTION <br /> <br /> <br />Furnish all equipment, labor, and materials required to widen a gapped timber supported section, Station 32 + 12 <br />to 32 + 95, sufficiently in horizontal dimension to allow moving 5.3' diameter (1.0,) steel pipe through the 83' <br />long section to pipe lined sections further west in the tunnel, and to allow lining of this section with 5.3" 1.0. <br />steel pipe. The Contractor shall prepare a submittal outlining plans for doing the work. The work may include, <br />but is not limited to, the following: bracing the existing timbers with steel supports between the gapped timbers, <br />trimming the insides of the existing timbers, removing and replacing alternating timber supports with wider <br />spaced steel supports or other approaches that provide for safety of personnel and protect the tunnel. This item <br />shall be paid for on a per lineal foot basis. <br />