Laserfiche WebLink
<br />. <br /> <br />\' <br />I[ <br />I, <br />:1 <br />Ii <br />, <br />, <br /> <br />Station 14 + 70 to 15 + 07 <br />Station 19+89 to 19+97 <br /> <br />The work includes installing the pipe, constructing temporary bulkheads, filling the annulus with cellular <br />concrete, contact grouting between the pipe and cellular concrete, conventional void grouting approximately 5' <br />above the existing support, and construction of shotcrete transitions and aprons. The work wii' include <br />approximately 200 yards' of celluiar concrete, 170 yards' of conventional grout, and 20 yards' of shotcrete. <br /> <br />1.18 REPAIR CONCRETE liNED SECTIONS WITH 5HOTCRETE AND GROUT <br /> <br /> <br />Furnish ail equipment, iabor, and materials to repair approximately 204 lineal feet of existing concrete liner with <br />shotcrete and grout. The concrete liner occurs in five sections as follows: <br /> <br />,I <br /> <br />Station 7 + 93 to 8 + 98 <br />Station 14+51 to 14+70 <br />Station 15 + 07 to 15 + 38 <br />Station 16+18to 16+41 <br />Station 17+06to 17+32 <br /> <br />j <br />'I <br /> <br />The work includes placing approximately 56 yards' of shotcrete and approximately 215 yards' of conventional <br />cement void grouting extending 5'above the concrete crown. <br /> <br />1.19 SHOTCRETE AND ROCK BOLTS <br /> <br />:t' <br />ii, <br /> <br />Furnish all equipment, iabor, and materials to install approximately 85 iineal feet of pattern rock bolts and <br />placing a 3" nominai layer of shotcrete from approximately spring line to spring line in various areas between <br />Stations 20+00 and 52 + 73. The work includes installing approximately 70 6-foot long rock bolts with <br />associated nuts, bearing plates, 28 mine straps, and placing approximately 20 yards' of shotcrete. <br /> <br />ill <br />" <br />I" <br />I', <br />" <br />I <br />, <br /> <br />!I <br />I, <br />I: <br />" <br /> <br />1.20 TRASH RACK AND STEEL DOOR <br /> <br />Furnish all equipment, labor, and materials to fabricate and install a trash rack and steel door at the eastern <br />tunnel portal. The door will be designed to limit unauthorized access, but allow periodic equipment access for <br />maintenance and inspection. The Contractor shall submit shop drawings detailing the structure. <br /> <br />1.21 REPAIR DEFLECTION WALL <br /> <br /> <br />Furnish all equipment, labor, and materials to repair the exiting deflection wall outside the eastern portal. The <br />work includes placing approximately 20 yards' of shotcrete on the existing concrete walls, placing approximately <br />60 yards' of grouted riprap, and placing approximately 45 yards' of D50 - 18" riprap in the stilling basin. <br /> <br />1.22 REGRADE AND RESTORE STAGING AREA AND ACCESS ROAD <br /> <br />Furnish all equipment, labor, and materials to regrade and revegetate the access road and the staging area. The <br />work includes approximately 3.3 acres of land, removing the culvert extension, removing gravei road base from <br />25% of road, ail silt fences and straw bales, and seeding with the designed seed mix. <br /> <br />END OF SECTION <br /> <br /> <br />Section 01010. Page 4 of 4 <br /> <br />10/00 <br />