<br /> <br />1.07 WIDEN TIMBER SUPPORTED SECTION <br /> <br />Furnish all equipment, labor, and materials required to widen a gapped timber supported section, Station 32 + 12 <br />to 32+95, sufficiently in horizontal dimension to allow moving 5.3' diameter (1.0.) steel pipe through the 83' <br />long section to pipe lined sections further west in th'e tunnel, and to allow lining of this section with 5.3' 1.0. <br />steel pipe. The Contractor shall prepare a submittal outlining plans for doing the work. The work may include, <br />but is not limited to, the foliowing: bracing the existing timbers with steel supports between the gapped timbers, <br />trimming the insides of the existing timbers, removing and replacing alternating timber supports with wider <br />spaced steel supports or other approaches that provide for safety of personnel and protect the tunnel. <br /> <br />1.08 STEEL PIPE LINER <br /> <br />Furnish all equipment, labor, and materials to install approximately 244 lineal feet of 5.3' internal diameter steel <br />pipe final liner. The pipe will be installed in 5 tunnel sections as identified below: <br /> <br />Station 23+97 to 24+03 <br />Station 32 + 12 to J3 + 58 <br />Station 38 + 16 to 38 + 25 <br />Station 38+45 to 38+58 <br />Station 52 + 73 to 53 + 33 <br /> <br />Square Timber <br />Square Timber <br />Square Timber <br />Square Timber <br />Steel Set Canopy <br /> <br />The work includes installing the pipe, constructing temporary bulkheads, filling the annulus with cellular <br />concrete, contact grouting between the pipe and cellular concrete, conventional void grouting approximately 5' <br />above the existing support (square timber and steel ribs), and construction of shotcrete transitions and aprons. <br />The work will include approximately 210 yards' of cellular concrete, 150 yards' of conventional grout, and 20 <br />yards' of shotcrete. <br /> <br />1.09 5 HOTCRETE AND ROCK BOlTS <br /> <br />Furnish all equipment, labor, and materials to install approximately 255 lineal feet of pattern rock bolts and <br />placing a 3" nominal layer of shotcrete from approximately spring line to spring line in various areas between <br />Stations 20+00 and 52 + 73. The work includes installing approximately 210 6.foot long rock bolts with <br />associated nuts, bearing plates, 80 mine straps, and placing approximately 60 yards' of shotcrete. <br /> <br />1.10 REPAiR CONCRETE LINED SECTIONS WiTH SHOTCRETE AND GROUT <br /> <br />Furnish all equipment, labor, and materials to repair approximately 72 lineal feet of existing concrete liner with <br />shotcrete anQ grout. The concrete liner occurs in two sections as follows: <br /> <br />Station 27+90 to 28+35 <br />Station 29+27 to 29+54 <br /> <br />The work includes placing approximately 20 yards' of shotcrete and approximately 75 yards' of conventional <br />cement void grouting extending approximately 5'above the concrete crown. <br /> <br />1.11 EXCAVATE MUCK FROM BALD TUNNEL <br /> <br />Furnish all equipment, labor, and materials to excavate approximately 600 yards' of caved rock rubble, boulders, <br />and treated timbers from approximately 350 lineal feet of tunnel extending from approximateiy Station 49 + 70 to <br />Station 52 + 73. The rock materials will be hauled to the eastern portal and placed on the existing muck pile in <br />areas approved by the Engineer. The timbers will be hauled to the portal and stockpiled at lower staging area for <br />, removal to a storage area by others. <br /> <br />Section 01010. Page 2 of 4 <br /> <br />lntnn <br /> <br />( <br />, <br />i <br />. <br />. <br />. <br />. <br />. <br />f <br /><< <br />. <br />t <br />. <br />. <br />t <br />. <br />t <br />. <br />. <br />. <br />. <br />