My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00054
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:08:45 AM
Creation date
10/5/2006 11:33:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153473
Contractor Name
Stewart Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
EO 08-08-86
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />'i <br /> <br />, The drilling, geotechnical and geophysical investigations will <br /> <br />be focused upon dete[lI\ining ehe causative mechanism{ s) of the <br /> <br />landslide, existing strength parameters, bedrock profile and ground- <br /> <br />water levels. The geophysical investigation may be used to establish <br /> <br />the alignment and depth of the reported, old, abandoned tunnel within <br />the hillside. <br /> <br />Hore detailed mapping of pre-slide and post-slide conditions <br /> <br />will be developed from aerial photography and mapping previously per- <br />formed by Delta Aerial Surveys plus field slope measurements of <br /> <br />existing conditions. <br /> <br />The mapping and geotechnical information will be used to perform <br /> <br />more detailed slope stability analysis of existing and potential <br /> <br />alternative configurations. <br /> <br />The potential remedial a.lternatives will be defined and <br /> <br />screened to approximately two primary alternates. <br /> <br />These two alte r- <br /> <br />natives will be analyzed to establish technical and economic <br /> <br />feasibility. <br /> <br />Cost estimates will be made of the two or three preferred <br /> <br />alternatives, the cost estimates will include construction engineering <br /> <br />and annual O&H cost to arrive at both a time series cost stream and <br /> <br />present worth of the alternatives. <br /> <br />The financial status (cost) <br /> <br />Stewart Ditch and Irrigation company will be examined to dete[lI\ine a <br /> <br />feasible annual repayment schedule and overall ability to pay. <br /> <br />U-4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.