My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00054
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:08:45 AM
Creation date
10/5/2006 11:33:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153473
Contractor Name
Stewart Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
EO 08-08-86
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />/.'"\ <br />...1 <br /> <br /><I <br /> <br />A feasibility level summary report consistant with CWCR quideU- <br /> <br />nes will be prepared for presentation to the Stewart Ditch and <br /> <br />Irrigation Company plus the Colorado Wtae Conservation Board (CWCB). <br /> <br />Hydro-Triad, Ltd. personnel would be available to assist the <br /> <br />Stewart Ditch and Irrigation Company or the ewCR on any required <br /> <br />public meet ings. <br /> <br />D. Final Design and Construction Documents <br /> <br />Objective - The objective for this phase is the preparation of <br /> <br />construction drawings and specifications for the remedial work. <br /> <br />This work item will consist of preparation of construction <br /> <br />drawings and specifications for potential contractors. The contract <br /> <br />documents would include bid forms. general and special conditions and <br /> <br />draft contract in addition to the technical specifications. <br /> <br />E. Construction Monitoring <br /> <br />Objective - The objective of this work task will be to provide <br /> <br />construction period consultation and monitoring (if necessary) for the <br /> <br />Stewart Ditch and Irrigation Co. <br /> <br />This work would be authorized if and when the project would move <br /> <br />into a construction phase. <br /> <br />The work would include consul tat ion on <br /> <br />II-S <br />
The URL can be used to link to this page
Your browser does not support the video tag.