Laserfiche WebLink
<br />/.'"\ <br />...1 <br /> <br /><I <br /> <br />A feasibility level summary report consistant with CWCR quideU- <br /> <br />nes will be prepared for presentation to the Stewart Ditch and <br /> <br />Irrigation Company plus the Colorado Wtae Conservation Board (CWCB). <br /> <br />Hydro-Triad, Ltd. personnel would be available to assist the <br /> <br />Stewart Ditch and Irrigation Company or the ewCR on any required <br /> <br />public meet ings. <br /> <br />D. Final Design and Construction Documents <br /> <br />Objective - The objective for this phase is the preparation of <br /> <br />construction drawings and specifications for the remedial work. <br /> <br />This work item will consist of preparation of construction <br /> <br />drawings and specifications for potential contractors. The contract <br /> <br />documents would include bid forms. general and special conditions and <br /> <br />draft contract in addition to the technical specifications. <br /> <br />E. Construction Monitoring <br /> <br />Objective - The objective of this work task will be to provide <br /> <br />construction period consultation and monitoring (if necessary) for the <br /> <br />Stewart Ditch and Irrigation Co. <br /> <br />This work would be authorized if and when the project would move <br /> <br />into a construction phase. <br /> <br />The work would include consul tat ion on <br /> <br />II-S <br />