My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00054
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:08:45 AM
Creation date
10/5/2006 11:33:16 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153473
Contractor Name
Stewart Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
EO 08-08-86
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
56
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.......\ <br />, ' <br /> <br />-~ <br /> <br />C. Phase II <br /> <br />Objective- The objective of the Phase II work will be the analy- <br /> <br />sis and preparation of a feasibility study (technical and economic) <br /> <br />which defines the remedial measures, program of construction, costs <br /> <br />and repayment schedule for loans. <br /> <br />This work phase will include the following sub-tasks: <br /> <br />I.. Drilling, geotechnical and geophysical inves tigations. <br /> <br />2. Obtain more detailed mapping sutable for design and <br />construction. <br /> <br />3. Perform more detailed slope stability analysis. <br /> <br />4. Define and evaluate remedial alternatives in more <br />detail. <br /> <br />5. Perform detailed cost estimates of the most feasible <br />alternatives (no more than three). <br /> <br />6. Perform a detailed economic analysis i.e. project costs, <br />various re-payment capacity. <br /> <br />7. Prepare a Feasibility Report for review and approval by <br />the Colorado Water Conservation Board and; <br /> <br />8. Attend and provide information during the public <br />meetings that may be required (assumed two). <br /> <br />The sub-tasks performed during Phase II will be integrated into <br /> <br />a mult If aceted, concurrent work program to maximize efficiency and <br /> <br />reduce the study schedule. This can be accomplished since the project <br /> <br />team (see section III of this proposal) is experieced and knowledge- <br /> <br />able on these type projects. <br /> <br />11-3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.