My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00051
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00051
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/26/2011 10:08:45 AM
Creation date
10/5/2006 11:33:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153473
Contractor Name
Stewart Ditch and Reservoir Company
Contract Type
Loan
Water District
40
County
Delta
Bill Number
EO 08-08-86
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
97
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />B. Previous Work <br /> <br />I <br /> <br />The slide area Was studied initially by Bruce Stover in June, 1986 <br /> <br />I <br /> <br />(Reference I). Later construction work was done to improve the stabi- <br /> <br />lity of the southern part of the slide. <br /> <br />The northern edge of the <br /> <br />I <br /> <br />slide area WaS left undisturbed. <br /> <br />I <br /> <br />C. Phase I Report <br /> <br />I <br /> <br />At the request of the Stewart Ditch and Irrigation Company an ini- <br /> <br />tial study. following the June, 1986 landslide. was prepared by <br /> <br />I <br /> <br />Hydro-Triad, Ltd. The study entitled "Phase I Report. Stewart Ditch <br /> <br />Slides. Paonia, Colorado", Was prepared for the Stewart Ditch and <br /> <br />I <br /> <br />I rrigation Company to provide a rapid assessment of the extent of <br /> <br />I <br /> <br />damage, poss i ble cause of failure. and a brief analysis of remedial <br /> <br />measures and preliminary cost estimates. This report was completed by <br /> <br />I <br /> <br />Hydro-Triad, Ltd. in September, 1986. <br /> <br />I <br /> <br />D. Phase II Report <br /> <br />Following the review of the Phase I Report by the Stewart Ditch <br /> <br />I <br /> <br />and Irrigation Company and the Colorado Water Conservation Board a <br /> <br />I <br /> <br />Phase II study was initiated. The objectives of this study and report <br /> <br />are to: <br /> <br />I <br /> <br />o <br /> <br />Present results <br />stabilization. <br /> <br />of <br /> <br />technical <br /> <br />feasbility studies for <br /> <br />I <br /> <br />1-2 <br /> <br />I <br /> <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.